 +The S153 line originates in Stratham and ends in Portsmouth. It shares the easement with the A-126, and a gas line.
  
 {{ :may_18_2023_e_pac_lines_map.png?linkonly |map of project location}} {{ :may_18_2023_e_pac_lines_map.png?linkonly |map of project location}}
Line 17: Line 17:
 {{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18, presentation to PAC, replace 16 out of 51 structures; $5. million}} {{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18, presentation to PAC, replace 16 out of 51 structures; $5. million}}
  
-{{ ::2023_05_18_meeting_minutes_final.pdf |2023 may 18 PAC minutes}}+{{ ::2023_05_18_meeting_minutes_final.pdf |2023 May 18 PAC minutes}}
  
 {{ ::s153:5-9-2023_a-126_h-141_s-153.pdf |2023, May 9: F&G permit conditions}} {{ ::s153:5-9-2023_a-126_h-141_s-153.pdf |2023, May 9: F&G permit conditions}}
Line 23: Line 23:
 {{ :a126:a126_-_h141_-_s153_aot_checklist.pdf |2023, April 3: AOT checklist}} {{ :a126:a126_-_h141_-_s153_aot_checklist.pdf |2023, April 3: AOT checklist}}
  
-{{ :a126:a126_-_h141_-_s153_aot_.pdf |2023, March 22: Alteration of Terrain application}}+{{ :a126:a126_-_h141_-_s153_aot_.pdf |2023, March 22: Alteration of Terrain application. "New steel poles will be installed. Existing conductors and static wire will be transferred to new steel poles."}} 
 + 
 +{{ :s153:s-153_cup_5-15-2023.pdf |2023, March 15: Conditional Use Permit application for Greenland}}
  
  
  
  