====== S-153 115kV line ====== | ====== S-153 115kV line ====== |
| |
The S153 line originates in Stratham and ends in Portsmouth. | The S153 line originates in Stratham and ends in Portsmouth. It shares the easement with the A-126, and a gas line. |
| |
| {{ :s153:a04_pac_es_nh_acr_s153_presentation.pdf |2025, July 23: Presentation to PAC, alternative 1; 6 structures, $2.7 m. (-50%, +200%), preferred alternative 15 structures, $5.99 m. (-25%, +50%). Presentation says there are 34 existing steel structures.}} |
| |
{{ :may_18_2023_e_pac_lines_map.png?linkonly |map of project location}} | {{ :may_18_2023_e_pac_lines_map.png?linkonly |map of project location}} |
| |
{{ :a126:a126_-_h141_-_s153_aot_.pdf |2023, March 22: Alteration of Terrain application. "New steel poles will be installed. Existing conductors and static wire will be transferred to new steel poles."}} | {{ :a126:a126_-_h141_-_s153_aot_.pdf |2023, March 22: Alteration of Terrain application. "New steel poles will be installed. Existing conductors and static wire will be transferred to new steel poles."}} |
| |
| {{ :s153:s-153_cup_5-15-2023.pdf |2023, March 15: Conditional Use Permit application for Greenland}} |
| |
| |
| |
| |