User Tools

Site Tools


u-199

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
u-199 [2025/01/12 01:34] sigridundsetu-199 [2025/06/11 03:34] (current) sigridundset
Line 1: Line 1:
 ====== U-199 115kV line ====== ====== U-199 115kV line ======
  
 +
 +{{ :u199:24-087-2025-06-06-nhdoe-testimony-devirgilio-1.pdf |2025, June 6: DOE witness DeVergilio testimony in support of Eversource with no evidence presented.}}
 +
 +{{ :u199:24-087-2025-06-06-nhdoe-position-statement.pdf |2025, June 6: After pretending to oppose Eversource and support Bethlehem, NH DOE shows its true position as a captured agency}}
 +
 +{{ :u199:24-087-2025-06-06-nhdoe-att-testimony-devirgilio.pdf |2025, June 6: DeVergilio resume and more responses to questions.}}
 +
 +{{ :u199:24-087-2025-05-09-bethlehem-notice-appearance-request-service-list-change.pdf |2025-5-9: Bethlehem re-appears in PUC docket}}
 +
 +{{ :u199:u-199_cost_increase.pdf |2025, March: U-199 cost increases from $51 m. to $71 m.}}
 +
 +{{ :u199:mesa_4-5-2025.jpg?linkonly |2025, April 5: construction mesas with rip-rap slopes}}
 +
 +{{ :u199:24-087-2025-04-01-bethlehem-withdrawal-notice-appearance.pdf |2025, April 1: Bethlehem legal counsel withdrawal from docket.}}
 +
 +{{ :u199:24-087-2025-03-31-eversource-motion-amend-petition-establish-procedural-schedule.pdf |2025, March 31: Eversource request to withdraw X-178 from docket.}}
 +
 +{{ :u199:2025-2-25_comment_to_puc_re_u-199_action_and_inaction.pdf |2025, February 2: Comment to PUC on two months of inactivity on the docket while the U-199 construction is moving toward Bethlehem.}}
  
 {{ :u199:pxl_20250108_191603642.jpg?linkonly |2025, January 8: matting}} {{ :u199:pxl_20250108_191603642.jpg?linkonly |2025, January 8: matting}}
Line 8: Line 26:
 {{:u199:pxl_20241221_160127285_2.jpg?linkonly|2024, December 21: construction}} {{:u199:pxl_20241221_160127285_2.jpg?linkonly|2024, December 21: construction}}
  
 +{{ :u199:cre-2024-007-license.pdf |2024, August 6: crossing license}}
  
 +{{ :u199:u199-structure-heights-littleton.pdf |2024: structure heights, Littleton, withheld for months by Eversource}}
  
-{{ :u199:cre-2024-007-license.pdf |2024, July: crossing license}} +{{ :u199:u199_line_rebuild_i_3_9_letter_es_24_t02.pdf |2024, February 14no adverse effects to system from U-199 rebuild}}
- +
-{{ :u199:u199_line_rebuild_i_3_9_letter_es_24_t02.pdf |2024, L}} +
- +
-{{ :u199:u199-structure-heights-littleton.pdf |2024: structure heights, Littleton, withheld}}+
  
 {{ :u199:2023_05_18_meeting_minutes_b112_-_u199_-_q195l.pdf |2023, May 18: PAC meeting minutes}} {{ :u199:2023_05_18_meeting_minutes_b112_-_u199_-_q195l.pdf |2023, May 18: PAC meeting minutes}}
  
-{{ :u199:u199-structure-heights-bethlehem.pdf |2024, May: Structure heights existing and proposed, Bethlehem}}+{{ :u199:u199-structure-heights-bethlehem.pdf |2024, May: Structure heights existing and proposed, Bethlehem, withheld for months by Eversource}}
  
 {{ :u199:u199-project-intro-fact-sheet.pdf |2024, May 16: Project Introduction "Fact Sheet."}} {{ :u199:u199-project-intro-fact-sheet.pdf |2024, May 16: Project Introduction "Fact Sheet."}}
Line 38: Line 54:
 {{ ::u199:u-199_2015_revised_crossing.pdf |2015, April 13: Order Nisi, Ammonoosuc River}} {{ ::u199:u-199_2015_revised_crossing.pdf |2015, April 13: Order Nisi, Ammonoosuc River}}
  
-{{ ::u199:u-199_crossing_ammonoosuc_2014.pdf |2014: exhibits for crossing Ammonoosuc River}}+{{ ::u199:u-199_crossing_ammonoosuc_2014.pdf |2014: exhibits for crossing Ammonoosuc River, steel structures, conductor remains 795}} 
  
-{{ :u199:u199_2015_stays_795_new_steel_towers.pdf |2014: Ammonoosuc crossing diagrams, steel structures conductor remains 795}} 
  
  
u-199.1736663663.txt.gz · Last modified: 2025/01/12 01:34 by sigridundset

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki