====== U-199 115kV line ====== | ====== U-199 115kV line ====== |
| |
| |
| {{ :u199:24-087-2025-06-06-nhdoe-testimony-devirgilio-1.pdf |2025, June 6: DOE witness DeVergilio testimony in support of Eversource with no evidence presented.}} |
| |
| {{ :u199:24-087-2025-06-06-nhdoe-position-statement.pdf |2025, June 6: After pretending to oppose Eversource and support Bethlehem, NH DOE shows its true position as a captured agency}} |
| |
| {{ :u199:24-087-2025-06-06-nhdoe-att-testimony-devirgilio.pdf |2025, June 6: DeVergilio resume and more responses to questions.}} |
| |
| {{ :u199:24-087-2025-05-09-bethlehem-notice-appearance-request-service-list-change.pdf |2025-5-9: Bethlehem re-appears in PUC docket}} |
| |
| {{ :u199:u-199_cost_increase.pdf |2025, March: U-199 cost increases from $51 m. to $71 m.}} |
| |
| {{ :u199:mesa_4-5-2025.jpg?linkonly |2025, April 5: construction mesas with rip-rap slopes}} |
| |
| {{ :u199:24-087-2025-04-01-bethlehem-withdrawal-notice-appearance.pdf |2025, April 1: Bethlehem legal counsel withdrawal from docket.}} |
| |
| {{ :u199:24-087-2025-03-31-eversource-motion-amend-petition-establish-procedural-schedule.pdf |2025, March 31: Eversource request to withdraw X-178 from docket.}} |
| |
| {{ :u199:2025-2-25_comment_to_puc_re_u-199_action_and_inaction.pdf |2025, February 2: Comment to PUC on two months of inactivity on the docket while the U-199 construction is moving toward Bethlehem.}} |
| |
{{ :u199:pxl_20250108_191603642.jpg?linkonly |2025, January 8: matting}} | {{ :u199:pxl_20250108_191603642.jpg?linkonly |2025, January 8: matting}} |
{{ :u199:cre-2024-007-license.pdf |2024, August 6: crossing license}} | {{ :u199:cre-2024-007-license.pdf |2024, August 6: crossing license}} |
| |
{{ :u199:u199-structure-heights-littleton.pdf |2024: structure heights, Littleton, withheld}} | {{ :u199:u199-structure-heights-littleton.pdf |2024: structure heights, Littleton, withheld for months by Eversource}} |
| |
{{ :u199:u199_line_rebuild_i_3_9_letter_es_24_t02.pdf |2024, February 14: no adverse effects to system from U-199 rebuild}} | {{ :u199:u199_line_rebuild_i_3_9_letter_es_24_t02.pdf |2024, February 14: no adverse effects to system from U-199 rebuild}} |
| |
| |
| |
{{ :u199:2023_05_18_meeting_minutes_b112_-_u199_-_q195l.pdf |2023, May 18: PAC meeting minutes}} | {{ :u199:2023_05_18_meeting_minutes_b112_-_u199_-_q195l.pdf |2023, May 18: PAC meeting minutes}} |
| |
{{ :u199:u199-structure-heights-bethlehem.pdf |2024, May: Structure heights existing and proposed, Bethlehem}} | {{ :u199:u199-structure-heights-bethlehem.pdf |2024, May: Structure heights existing and proposed, Bethlehem, withheld for months by Eversource}} |
| |
{{ :u199:u199-project-intro-fact-sheet.pdf |2024, May 16: Project Introduction "Fact Sheet."}} | {{ :u199:u199-project-intro-fact-sheet.pdf |2024, May 16: Project Introduction "Fact Sheet."}} |