User Tools

Site Tools


u-199

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
u-199 [2025/06/11 03:08] sigridundsetu-199 [2025/07/29 05:24] (current) sigridundset
Line 2: Line 2:
  
  
-{{ :u199:24-087-2025-06-06-nhdoe-testimony-devirgilio-1.pdf |2025, June 6DOE witness testimony in support of Eversource with no evidence presented.}}+{{ :u199:24-087-2025-07-24-nhpuc-proc-order-re-mot-for-summary-resolution-of-proceeding.pdf |2025, July 24PUC denies Eversource motion for summary waiver.}}
  
-{{ :u199:24-087-2025-06-06-nhdoe-position-statement.pdf |2025, June 6After pretending to oppose Eversource and support Bethlehem, NH DOE shows its true position as a captured agency}}+{{ :u199:u-199_2025_and_2022.png?linkonly |2025, June: Google Earth U-199 2025 and 2022}}
  
-{{ :u199:24-087-2025-06-06-nhdoe-att-testimony-devirgilio.pdf |}}+{{ :u199:24-087-2025-07-22-eversource-motion-summary-resolution-proceeding.pdf |2025, July 22: Eversource motion for summary waiver of Bethlehem's zoning.}} 
 + 
 +{{ :u199:doe_witness_contradicts_eversource_23-087_1.pdf |2025, June: DOE witness DeVergilio contradicts Eversource testimony}} 
 + 
 +{{ :u199:24-087-2025-06-06-nhdoe-testimony-devirgilio-1.pdf |2025, June 6: DOE witness DeVergilio testimony in support of Eversource with no evidence presented.}} 
 + 
 +{{ :u199:24-087-2025-06-06-nhdoe-position-statement.pdf |2025, June 6: After pretending to oppose Eversource and support Bethlehem, NH DOE acts as a captured agency}} 
 + 
 +{{ :u199:24-087-2025-06-06-nhdoe-att-testimony-devirgilio.pdf |2025, June 6: DeVergilio resume and more responses to questions.}}
  
 {{ :u199:24-087-2025-05-09-bethlehem-notice-appearance-request-service-list-change.pdf |2025-5-9: Bethlehem re-appears in PUC docket}} {{ :u199:24-087-2025-05-09-bethlehem-notice-appearance-request-service-list-change.pdf |2025-5-9: Bethlehem re-appears in PUC docket}}
Line 25: Line 33:
  
 {{:u199:pxl_20241221_160127285_2.jpg?linkonly|2024, December 21: construction}} {{:u199:pxl_20241221_160127285_2.jpg?linkonly|2024, December 21: construction}}
 +
 +{{ :u199:u199-permitting-plans_2025-1.pdf |2024, October: permitting/construction plans}}
  
 {{ :u199:cre-2024-007-license.pdf |2024, August 6: crossing license}} {{ :u199:cre-2024-007-license.pdf |2024, August 6: crossing license}}
 +
 +{{ :u199:cre-2024-007-staff-recommendation.pdf |2024, August 5: Staff recommendation}}
 +
 +{{ :u199:cre-2024-007-exhibits.pdf |2024: Exhibits for crossings dated 12/29/2023 and 12/2016}}
 +
 +{{ :u199:cre-2024-007_u-199-application.pdf |2024, August 1: Application for crossings}}
  
 {{ :u199:u199-structure-heights-littleton.pdf |2024: structure heights, Littleton, withheld for months by Eversource}} {{ :u199:u199-structure-heights-littleton.pdf |2024: structure heights, Littleton, withheld for months by Eversource}}
Line 42: Line 58:
 {{ ::u199-permitting-plans.pdf |2023, October 10: DRAFT permitting plans}} {{ ::u199-permitting-plans.pdf |2023, October 10: DRAFT permitting plans}}
  
-{{ ::2023_05_18_meeting_minutes_final.pdf |2023 May 18 PAC minutes, Replace 104 wood and 1 steel structures with new steel structures, Re-conductor 9.75 miles of 795ACSR with 1272 ACSS, Install 19.5 miles of OPGW (2 x 9.75 mi), Estimated PTF Cost: $51.18M (-25% / +50%), Projected In-service Date: Q2, 2026}}+{{ ::2023_05_18_meeting_minutes_final.pdf |2023 May 18 PAC minutes, Replace 104 wood and 1 steel structures with new steel structures, Re-conductor 9.75 miles of 795 ACSR with 1272 ACSS, Install 19.5 miles of OPGW (2 x 9.75 mi), Estimated PTF Cost: $51.18M (-25% / +50%), Projected In-service Date: Q2, 2026}}
  
 {{ ::b112-u199-q195_rebuild_presentation.pdf |2023, May 18, presentation to PAC}} {{ ::b112-u199-q195_rebuild_presentation.pdf |2023, May 18, presentation to PAC}}
u-199.1749625718.txt.gz · Last modified: 2025/06/11 03:08 by sigridundset

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki