User Tools

Site Tools


v-182

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
v-182 [2023/10/23 05:55] sigridundsetv-182 [2024/04/11 02:58] (current) sigridundset
Line 1: Line 1:
-V-182+====== V-182 ====== 
 + 
 +{{ :v182:a05_2023_06_15_pac_laminated_wood_structure_replacements_phase_3.pdf |2023, June 15: Presentation to PAC}}
  
 {{ ::f139:aot-2388_plans.pdf |2023, June 15: AoT Permitting Plans}} {{ ::f139:aot-2388_plans.pdf |2023, June 15: AoT Permitting Plans}}
Line 5: Line 7:
 {{ ::f139:transmittal_final_documents_re_external_v182_f139_transmission_line_rebuild_project.pdf |2023, June 5: transmittal final documents}} {{ ::f139:transmittal_final_documents_re_external_v182_f139_transmission_line_rebuild_project.pdf |2023, June 5: transmittal final documents}}
  
-{{ :v182:v182_-_f139_expired_links_to_aots.pdf |2023, June 5: expired links to AoT documents}}+{{ :v182:aot-2388_plans.pdf |2023, June 5: AoT "Maintenance' Permitting map plans}}
  
 {{ :f139:d182_-_f139_des_permit_with_waivers_5-29-2023.pdf |2023, May 29: AoT permit waiving {{ :f139:d182_-_f139_des_permit_with_waivers_5-29-2023.pdf |2023, May 29: AoT permit waiving
 specific requirements of Env-Wq 1503.12(d)(1 & 2), Env-Wq 1503.21(c)(2), and Env-Wq 1504.09,}} specific requirements of Env-Wq 1503.12(d)(1 & 2), Env-Wq 1503.21(c)(2), and Env-Wq 1504.09,}}
  
-{{ ::eversource_franklin_northfield_canterbury_concord_des_wetlands_rfmi_5.13.23.pdf |2023, May 13: DES request for more information}}+{{ :v182:eversource_franklin_northfield_canterbury_concord_des_wetlands_rfmi_5.13.23.pdf |2023, May 13: DES request for more information }} 
 + 
 +{{ :v182:v-182_2023-010-application.pdf |2023, April 19: petition for crossing, Canterbury, Northfield and Franklin}} 
 + 
 +{{ :v182:v-182_2023-010-application-exhibits.pdf |2023: petition for crossing exhibits}}
  
 {{ ::v182-f139-project-fact-sheet.pdf |2023, April: project fact sheet}} {{ ::v182-f139-project-fact-sheet.pdf |2023, April: project fact sheet}}
Line 16: Line 22:
 {{ :v182:v182_-_f139_aot_checklist.pdf |2023, April 5: AoT checklist}} {{ :v182:v182_-_f139_aot_checklist.pdf |2023, April 5: AoT checklist}}
  
-{{ :f139:f139_aot_applications.pdf |2023, March 10: AoT application, VHB}}+{{ ::f139:aot-2388_aot_package.pdf |2023, March 10: Alteration of Terrain application "The total land disturbance for the project was calculated to be approximately 61.1 acres. The disturbance area includes the work padsaccess roads, and the estimated limits of necessary grading." }}
  
-{{ ::f139:transmittal_final_documents_re_external_v182_f139_transmission_line_rebuild_project.pdf |2023, June 5: transmittal final documents}} +{{ ::item4a_eversource_v182_f139_transmission_lines.pdf |2023, February 22Presentation to ?}}
- +
-{{ :v182:v182_-_f139_expired_links_to_aots.pdf |2023, June 5expired links to AoT documents}}+
  
 {{ :v182:v182_des_permit_with_waivers_9-9-2022.pdf |September 9, 2022: DES permit waiving specific requirements of Env-Wq 1503.22(c)(3 - 8) and Env-Wq 1504.09,  }} {{ :v182:v182_des_permit_with_waivers_9-9-2022.pdf |September 9, 2022: DES permit waiving specific requirements of Env-Wq 1503.22(c)(3 - 8) and Env-Wq 1504.09,  }}
Line 28: Line 32:
 {{ :v182:v182_stamped_page_aot.pdf |2022, July 19: AoT stamped page}} {{ :v182:v182_stamped_page_aot.pdf |2022, July 19: AoT stamped page}}
  
-{{ :v182:a05_2023_06_15_pac_laminated_wood_structure_replacements_phase_3.pdf |2023, June 15Presentation to PAC}}+{{ ::22-049_2022-08-24_eversource_att-pet-approval-financing-transaction.pdf |2022, June 30complete DE-22-049 document listing E$ proposed spending}}
  
 {{ :v182:v182_transmittal_proof.pdf |2022, June 8: proof of transmittal}} {{ :v182:v182_transmittal_proof.pdf |2022, June 8: proof of transmittal}}
  
 {{ :v182:v182_des_permit_with_waivers_and_aot_application.pdf |2022, June 6: DES permit with AoT application and emails}} {{ :v182:v182_des_permit_with_waivers_and_aot_application.pdf |2022, June 6: DES permit with AoT application and emails}}
- 
-{{ :v182:v182_-_f139_expired_links_to_aots.pdf |2023, June 5: expired links to AoT documents}} 
- 
-{{ :v182:aot-2388_plans.pdf |2023, June 5: AoT Permitting map plans}} 
- 
-{{ :f139:d182_-_f139_des_permit_with_waivers_5-29-2023.pdf |2023, May 29: AoT permit waiving 
-specific requirements of Env-Wq 1503.12(d)(1 & 2), Env-Wq 1503.21(c)(2), and Env-Wq 1504.09,}} 
  
 {{ :v182:c189_g146_m137_m108_5-22-2023.pdf |2022, May 22: AoT Permit map set }} {{ :v182:c189_g146_m137_m108_5-22-2023.pdf |2022, May 22: AoT Permit map set }}
Line 46: Line 43:
  
 {{ :v182:v182_final_environmental_resources_map_5-13-2022.pdf |2022, May 13: environmental resources map}} {{ :v182:v182_final_environmental_resources_map_5-13-2022.pdf |2022, May 13: environmental resources map}}
- 
-{{ :v182:eversource_franklin_northfield_canterbury_concord_des_wetlands_rfmi_5.13.23.pdf |2023, May 13: DES request for more information }} 
- 
-{{ :v182:v182_f139_line_replacement_called_maintenance_aot_5-5-2023.pdf |2023, May 5:}} 
- 
-{{ ::f139:aot-2388_aot_package.pdf |2023, March 10: Alteration of Terrain application "The total land disturbance for the project was calculated to be approximately 61.1 acres. The disturbance area includes the work pads, access roads, and the estimated limits of necessary grading." }} 
- 
-{{ :v182:v182_-_f139_aot_checklist.pdf |2023, April 5: AoT checklist}} 
- 
-{{ ::item4a_eversource_v182_f139_transmission_lines.pdf |2023, February 22: Presentation to ?}} 
  
 {{ :v182:05.10.2023.pdf |2022, May 10: Concord Conservation Commission minutes}} {{ :v182:05.10.2023.pdf |2022, May 10: Concord Conservation Commission minutes}}
Line 67: Line 54:
 {{ ::v182:1-cre-2022-009-petition.pdf |2022, March 22: E$ Petition for River and Public Lands crossings}} {{ ::v182:1-cre-2022-009-petition.pdf |2022, March 22: E$ Petition for River and Public Lands crossings}}
  
-{{ :v182:2-cre-2022-009-petition-attachments.pdf |2022, January 16: petition attachments also dated "NP 12/2016}}+{{ :v182:2-cre-2022-009-petition-attachments.pdf |2022, January 16: petition attachments also dated 12/2016}}
  
 {{ :v182:np_v182_f139.pdf |2015, August 15: Northern Pass Public Waters and Land crossing diagrams}} {{ :v182:np_v182_f139.pdf |2015, August 15: Northern Pass Public Waters and Land crossing diagrams}}
 +
 +{{ :v182:v-182_2008-07-08_nh_des_wetland_permit.pdf |2008, July 8: DES wetland permit}}
 +
 +{{ :v182:v-182_2008-08-18_liberty_s_review_summary.pdf |2008, August 18: Liberty review summary}}
 +
 +{{ :v182:v-182_2008-05-30_order_no._24_859_order_nisi_granting_license.pdf |2008, May 30: Order Nisi granting license}}
 +
 +{{::08-064_2008-04-24_petition_for_licenses_to_construct_and_maintain_electric_lines_and_fiber_optic_cable-_public_waters.pdf |2008, April 24: Petition for crossing}}
 +
 +{{ ::08-064_2008-04-24_appendix_a_exhibit_1_and_2.pdf |2008: Profile Merrimack River crossing}}
 +
 +{{ ::08-064_2008-04-24_appendix_b_exhibit_3_and_4.pdf |2008: Profile Soucook River crossing Concord-Pembroke}}
 +
 +{{ ::08-064_2008-04-24_appendix_c_exhibit_5_and_6.pdf |2008: Profile Soucook River crossing Pembroke}}
 +
 +{{ ::08-064_2008-04-24_appendix_d_exhibit_7_and_8.pdf |2008: Crossing Turtle Town Pond}}
 +
 +{{ ::08-064_2008-04-24_appendix_e_exhibit_7_and_9.pdf |2008: Crossing Turtle Town Pond}}
 +
 +{{ ::08-064_2008-04-24_appendix_f_exhibit_10_and_11.pdf |2008: Crossing Merrimack River, Franklin-Northfield.}}
 +
 +{{ ::08-064_2008-04-24_appendix_g_exhibit_12_and_13.pdf |2008: Crossing Chance Pond}}
 +
 +{{ :f162:1994_f-162_t-198_n-186_l-163_p-145_v-182_de_94-272.pdf |1995, September 6: as identified in Appendix 9 of the petition and on drawings D-7649-394/Exhibit 1, D-7649-394/Exhibit 2, D-7649-395/Exhibit 1, and D-7649-395/Exhibit 2, are over Turtle Pond in Concord, NH}}
v-182.1698054905.txt.gz · Last modified: 2023/10/23 05:55 by sigridundset

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki