 ====== W-157 ====== ====== W-157 ======
  
 +{{ ::eversource_2024_lsp_a.pdf |2024, November 20: Local System Plan, in-service, $16.5 m.}}
  
 {{ ::2023_11_15_topac_lsp_eversource_presentation.pdf |2023, November 15: Eversource TOPAC (Transmission Owners Planning Advisory Committee presentation to PAC}} {{ ::2023_11_15_topac_lsp_eversource_presentation.pdf |2023, November 15: Eversource TOPAC (Transmission Owners Planning Advisory Committee presentation to PAC}}
Line 6: Line 7:
 {{ ::w157:w-157_-2023-011-application.pdf |2023, June 1: Petition to cross Merrimack and Souhegan Rivers and Beaver Brook: "The proposed project for the W157 Line encompasses replacing the existing two shield wires with two optical ground wires at the pole top position and structure replacements from wood to weathering steel at crossing locations subject to this petition comprising Structures 18 through 22, 25, 34, and 93. Structures 16, 17, 26, 33, 92, 112 and 113 are in good functional condition and will remain as wood. Structures 7 and 8, at the Merrimack River crossing were replaced from wood to steel in 2016 without a license owing to oversite and will be licensed as a result of this application. The 3 existing conductors having the characteristics noted in the Cable Schedule of Exhibits 2 through 8 will be unchanged." }} {{ ::w157:w-157_-2023-011-application.pdf |2023, June 1: Petition to cross Merrimack and Souhegan Rivers and Beaver Brook: "The proposed project for the W157 Line encompasses replacing the existing two shield wires with two optical ground wires at the pole top position and structure replacements from wood to weathering steel at crossing locations subject to this petition comprising Structures 18 through 22, 25, 34, and 93. Structures 16, 17, 26, 33, 92, 112 and 113 are in good functional condition and will remain as wood. Structures 7 and 8, at the Merrimack River crossing were replaced from wood to steel in 2016 without a license owing to oversite and will be licensed as a result of this application. The 3 existing conductors having the characteristics noted in the Cable Schedule of Exhibits 2 through 8 will be unchanged." }}
  
-{{ ::w157:w-157_-2023-011-exhibits.pdf |2023, November: crossing exhibits}}+{{ ::w157:w-157_-2023-011-exhibits.pdf |2023, November: crossing exhibits; 48-144 fiber .646 OPGW, 795 ASCR 36/1 conductor}}
  
-{{ ::w157:w-157_2023-011-exhibits.pdf |}} 
  
-{{ ::w157:w-157_petition.pdf |}} 