User Tools

Site Tools


w-171

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
w-171 [2024/07/09 03:00] sigridundsetw-171 [2024/11/22 08:14] (current) sigridundset
Line 1: Line 1:
 W-179 115kV Line W-179 115kV Line
  
-{{ ::w179:tca_including_w-179.pdf |2024, : TCA}}+{{ ::eversource_2024_lsp_a.pdf |2024, November 20Local System Plan, in-service, $64.5 m.}}
  
-{{::w179:w-179_6-28-2024_des_permit.pdf |2024, June 24: DES permit}}+{{ :w179:w-179_dummer.pdf |2024, June 28: DES permit for wetlands impacts cover letter}}
  
-{{ ::w179:w-179_tca.pdf |2024, }}+{{::w179:w-179_6-28-2024_des_permit.pdf |2024, June 28: DES permit "This is for the portion of a large-scale project where the installation of construction mats in wetlands exceeds one growing season for completion of the replacement of overhead static wires with optical ground wire."}}
  
 {{ ::2023_11_15_topac_lsp_eversource_presentation.pdf |2023, November 15: Eversource TOPAC (Transmission Owners Planning Advisory Committee presentation to PAC}} {{ ::2023_11_15_topac_lsp_eversource_presentation.pdf |2023, November 15: Eversource TOPAC (Transmission Owners Planning Advisory Committee presentation to PAC}}
 +
 +{{ ::w179:w-179_tca.pdf |2023, September 20: No significant effect on reliability for W-178 (3)}}
  
 {{ ::w-179_des_permit_with_waivers.pdf |2023, April 4: DES permit with waivers of Env-Wq 1503.12(d)(1 & 2), Env-Wq 1503.21(d)(6 & 7) and Env-Wq 1504.09,}} {{ ::w-179_des_permit_with_waivers.pdf |2023, April 4: DES permit with waivers of Env-Wq 1503.12(d)(1 & 2), Env-Wq 1503.21(d)(6 & 7) and Env-Wq 1504.09,}}
w-171.1720508439.txt.gz · Last modified: 2024/07/09 03:00 by sigridundset

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki