====B-112 115kV line==== {{ :b112:b-112_construction_2.mp4 |2024: Supreme Industries construction video 1}} {{ :b112:b-112_construction.mp4 |2024: Supreme Industries construction video 2}} {{:b112:northern_new_hampshire_.png?linkonly|2023: Supreme Industries construction photo}} {{:b112:b-112_3.png?linkonly|2023, September: Fish & Game construction photo}} {{ :b112:b-112_photo_1.png?linkonly |2023, September: Fish & Game construction photo}} {{ :b112:b-112_photo_2.png?linkonly |2023, September: Fish & Game construction photo}} {{ :b112:raarp_forms_-_rtk_request_-_redacted_3_of_4.pdf |2023, September: Reptile and Amphibian sitings including 345kV lines 326 and 380, 2022}} {{ :b112:raarp_forms_-_rtk_request_-_redacted_2_of_4.pdf |2023, July: Reptile and Amphibian sitings, including 345kV lines 380 and 385.}} {{ :307:raarp_forms_-_rtk_request_-_redacted_1_of_4.pdf |2023, June: Reptile and Amphibian sitings, including 345kV line 307, 2022.}} {{ :b112:b112_line_rebuild_i_3_9_letter_es_23_t30.pdf |2023, June 14: interconnection creates no problem with reliability of the grid}} {{ ::2023_05_18_meeting_minutes_final.pdf |2023 May 18 PAC minutes, Replace 254 wood structures with new steel structures, Re-conductor 22.9 miles of 336 ACSR with 1272 ACSS, Install 45.8 miles of OPGW (2 x 22.9 mi) Estimated PTF Cost: $105.43M (-25% / +50%) Projected In-service Date: Q4, 2024}} {{ ::b112-u199-q195_rebuild_presentation.pdf |May 18, 2023 Line rebuild presentation to PAC}} {{ ::beebe-river-white-lake-project-fact-sheet.pdf |fact sheet}} {{ ::beebe-river-white-lake-soc.pdf |2023, May 17: Dear Neighbor letter about reliable power}} {{ ::b112:aot2336_rm.pdf |2023, March 31: DES permission with waivers}} {{:b112:transmittal_of_final_documents_re_b112_transmission_line_rebuild_nhb22-2059_campton_sandwich_tamworth.pdf |2023, March 31, cover letter for final documents transmittal}} {{ ::b112:aot-2336_miscellaneous.pdf |2023, February 17: Alteration of Terrain application}} {{:b112:final_nhfg_conditions_re_nhfg_review_nhb22-2059_nhb22-2060_nhb22-2061_eversource_b112_structure_replacement_campton_sandwich_tamworth.pdf |2023, February 3: NH Fish & Game's "recommended permit conditions that were initially issued 11/18/22 amended to include the unavoidable vernal pool buffer impacts"}} {{ ::b112:aot-2336_plans.pdf |2023, February 1: Alteration of Terrain Plans water resources}} {{ ::1-cre-2022-023-application.pdf |2022, November: application}} {{ ::2_-cre-2022-023-application-exhibits.pdf |2022 application exhibits}} {{ ::3_-cre-2022-023-energy-staff-recommendation.pdf |2022 staff recommendation}} {{ ::4_-_cre-2022-023-license.pdf |2022, November 18" license}} {{ ::b112_fish_and_game_email.pdf |2022, November 18: F&G email permit conditions}} {{ ::22-049_2022-08-24_eversource_att-pet-approval-financing-transaction.pdf |2022, June 30: complete DE-22-049 document listing E$ proposed spending}} {{ ::responses_to_stakeholder_comments_on_the_new_hampshire_2029_solutions_study_update.pdf |Undated NHEC response to stakeholder comments on nh 2029 solutions study update}} {{ :b112:d.p.u._18-64-65-66_-_notice_of_tsa_third_amendments.pdf |2021, November 17: TSA requirements for connecting to Maine HVDC project "b. Public Service Company of New Hampshire (d/b/a Eversource Energy), as an Affected Party as defined in the ISO-NE Tariff, is responsible to upgrade both segments of 115 kV B112 Line (Beebe River – F190 Tap – White Lake) to increase the summer LTE rating to at least 147 MVA.'}}