D-121 115kV line {{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}} {{ :d121:d-121_2023-015-application.pdf |2023, June 14: structure structure will be replaced with a weathering steel equivalent, the existing three conductors, and two OPGW wires will be unchanged }} {{ :d121:d-121_2023-015-application-exhibits.pdf |2023, June 14:crossing exhibits; 795 ASCR 36/1 Coot, 48 fiber .646 AFL S3-81/69/646 OPGW}} {{ :d121:d121_aot_checklist.pdf |2023, June 14: AoT checklist}} {{ :d121:d121_permit_with_waivers.pdf |2023, May 14: DES permit waiving specific requirements of Env-Wq 1503.12(d)(1 & 2), Env-Wq 1503.21(d)(6 & 7), and Env-Wq 1504.09,}} {{ ::391:2023_05_18_meeting_minutes_final.pdf |2023, May 18 PAC minutes "A stakeholder suggested the ISO could take an “if you build it, they will come approach” but another stakeholder raised concern that this could be “building a bridge to nowhere.” "}} {{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18, presentation to PAC, replace 18 out of 154 structures; $5. million}} {{ :d121:aot2377_rm.pdf |2023, May 14: DES permit with waivers}} {{ :d121:aot-2377_miscellaneous.pdf |2023, March 28: Alteration of Terrain application}} {{ :d121:d121_water_resources_aot_3-23-2023.pdf |2023, March 23: Water Resources maps}} {{ :d121:d-121_goldenrod.pdf |2022, August 3: Goldenrod}} {{ ::22-049_2022-08-24_eversource_att-pet-approval-financing-transaction.pdf |2022, June 30: complete DE-22-049 document listing E$ proposed spending}} {{ ::document.pdf |2021, December 9: Town of Bow, Conditional Use Permit and public hearing on wetlands damage and after-the-fact truck access}} {{ ::d121-cr2021-008-order-of-notice.pdf |2021, September 28: prehearing order}} {{ :d121:d121_aot_cover_sheet_.pdf |2021, August 18: AoT cover sheet}} {{ :d121:d121_des_permit_with_waivers.pdf |2021, August 18: DES permit waiving specific requirements of Env-Wq 1504.09, }} {{ :d121:d121_surface_and_groundwater_overlay_aot_8-18-2021.pdf |2021, August 18: Surface and Groundwater maps}} {{ ::21-111_2021.08.26_eversource_replacement-crossing-petition.pdf |2021, August petition}} {{ :d121:a3_eversource_115_kv_and_230_kv_wood_pole_and_shield_wire_replacement.pdf |2021, June 16: presentation to PAC}} {{ :d121:d121_wildlife_assessment_5-2021.pdf |2021, May 18: Wildlife assessment}} {{ :d121:d121_aot_application.pdf |2021, May 17: Original AoT application}} {{ :d121:d121_wildlife_assessment_5-2021.pdf |2021, May: Wildlife assessment}}