E-115 115kV Line $64 million {{ ::2023_11_15_topac_lsp_eversource_presentation.pdf |2023, November 15: Eversource TOPAC (Transmission Owners Planning Advisory Committee presentation to PAC}} {{ ::e-115_z-1180_and_a-111_2023.pdf |2023, March 14: NEPOOL recommends ISO approval of $100 m.+ for A-11, E-115 and Z-180 for Transmission Cost Allowance}} {{ ::e-115_z-1180_and_a-111_2023.pdf |2023, March: request to NEPOOL for TCA}} {{ :a-111_long_road.png?linkonly |Long road}} {{ ::a-111_wetland_matting.jpeg?linkonly |Wetland matting}} {{ ::a-111_sign.jpeg?linkonly |Stay away sign}} {{ ::a-111_road_road.jpeg?linkonly |Road and wetlands matting on ROW and new structures, conductor and OPGW}} {{ ::a-111_pole_and_water.jpeg?linkonly |New pole in water}} {{ ::a-111_new_hampton.jpeg?linkonly |Large truck hauling flatbed on wetland matting and road in ROW.}} {{ ::a-111_embedded_pole.jpeg?linkonly |Two new poles in water}} {{ ::a-111_bulldozer.jpeg?linkonly |Excavator, gravel truck and other heavy machinery on ROW}} {{ ::attachment_rr-dpu-es-3.pdf |2022, October 19; PAC presentation }} {{ :a05_1_es-22-tca-20_final.pdf |2022, June 27: Eversource Transmission Cost Allocation application}} {{ ::22-049_2022-08-24_eversource_att-pet-approval-financing-transaction.pdf |2022, June 30: complete DE-22-049 document listing E$ proposed spending}} {{ :e115:e115_aot_amended_plan_6-24-2022.pdf |2022, June 24: AoT permit plans amended}} {{ ::road_construction_on_the_e-115_line.pdf |road construction on the E-115 before replacement with new larger line with taller and wider steel towers and larger conductor}} {{ ::22-049_2022-08-24_eversource_att-pet-approval-financing-transaction.pdf |2022, June 30: complete DE-22-049 document listing E$ proposed spending}} {{ ::e115-start-of-construction-letter.pdf |2022, June 23; start of construction letter}} {{ ::e115-project-maps.pdf |2022, May 12: Access and permitting plans}} {{ :e115:aot_e115_rm.pdf |2022, April 22: DES permit with waivers}} {{ :e115:e115_start_of_construction.pdf |2022, April 22: Start of Construction }} {{ ::03-29-22_mtg_minutes_prlac.pdf |2022, March 23; PRLAC (Pemigewasset River Local Advisory Committee) Minutes. Eversource later said no permits were required.}} {{ :e115:e15_cover_page_stamped.pdf |2022, March 1 AoT first page stamped}} {{ :e115:e115_aot_application_3-2022.pdf |2022, March: AoT application}} {{ :e115:e115_ground_and_surface_water_overlay_map_2-21-2022.pdf |2022, February 21: Surface and Groundwater overlay maps, GZA}} {{ :iso_7-15-2021_no_significant_impact_of_interconnection.pdf |2021, July 15: no impact from interconnection}} {{ :a111:a-111_1537_2021-0906.pdf |2021, March 9: inspection permit DES}} {{ ::license-granted.pdf |2022, January 31: license granted}} {{ ::cr-2021-025-order-of-notice.pdf |2021, January 14: order of notice}} {{ ::staff-recommendation.pdf |2022, January 10: staff recommendation}} {{ ::petition-attachments.pdf |December 2021, petition attachments, 12/2016 original date, pole heights 52'-106'}} {{ ::e1115crossing.pdf |2021, December 21: E$ petition for crossing}} {{ :2017_river_crossings_existing_poles_and_wires_just_fine.pdf |2017 river crossing rights exhibits}} {{ ::pre-np_multi_line_assertion_of_rights_2017-12-14_eversource_petition_water_crossing.pdf |2017, December 14: assertion of 2015 assertion of crossing rights}} {{ ::e-115_and_a-111_2-15.png?linkonly |2015: "The load and added local generation in this area has not required the upgrading of either line."}} {{ :e115:e-115_planned_upgrade_reliability_10-2012.png?linkonly |2012, October: Proposed reliability upgrade}}