F-139 115kv line {{ :f139:f-139_2023-016-application.pdf |2023: crossing petition}} {{ :f139:f-139_2023-016-application-exhibits.pdf |2023: crossing exhibits}} {{ ::f139:aot-2388_plans.pdf |2023, June 15: AoT Permitting Plans}} {{ ::f139:transmittal_final_documents_re_external_v182_f139_transmission_line_rebuild_project.pdf |2023, June 5: transmittal final documents}} {{ :v182:v182_-_f139_expired_links_to_aots.pdf |2023, June 5: expired links to AoT documents}} {{ :f139:d182_-_f139_des_permit_with_waivers_5-29-2023.pdf |2023, May 29: AoT permit waiving specific requirements of Env-Wq 1503.12(d)(1 & 2), Env-Wq 1503.21(c)(2), and Env-Wq 1504.09,}} {{ :f139:f139_aot_applications.pdf |2023, March 10: AoT application, VHB}} {{ ::eversource_franklin_northfield_canterbury_concord_des_wetlands_rfmi_5.13.23.pdf |2023, May 13: DES request for more information}} {{ ::v182-f139-project-fact-sheet.pdf |2023, April: project fact sheet}} {{ :v182:v182_-_f139_aot_checklist.pdf |2023, April 5: AoT checklist}} {{ ::f139:aot-2388_nhfg_conditions.pdf |2023, March 23: nh fish and game alteration of terrain conditions}} {{ ::2023_03_16_pac_minutes_final.pdf |2023, March 16: PAC minutes}} {{ ::item4a_eversource_v182_f139_transmission_lines.pdf |2023, February 22: Presentation to ?}} {{ :v182:05.10.2023.pdf |2022, May 10: Concord Conservation Commission minutes}} {{ :v182:4-cre-2022-009-license.pdf |2022, April 18: License for crossings}} {{ ::a2_eversourcce_115kv_wood_pole_and_shield_wire_replacements_2020_2023_rev1_redline.pdf |December 2019, 2020-2023 revisions PAC presentation}} {{ ::eversource_139_and_others.pdf |March 2023 PAC presentation}} {{ ::05.10.2023.pdf |2022, May 10: Concord Conservation Commission minutes}} {{ ::26479e.pdf |2021, May 12, PUC permission to cross river}} {{ ::de-20-058.pdf |2020, September 21: permission to cross river}} {{ ::f139:aot-2388_plans.pdf |2023, June 5:Asset Condition projects called Maintenance Projects}} {{ ::f139:aot-2388_aot_package.pdf |2023, March 10: Alteration of Terrain application "The total land disturbance for the project was calculated to be approximately 61.1 acres. The disturbance area includes the work pads, access roads, and the estimated limits of necessary grading." }} {{ ::f139_maps.pdf |2020, April 3: water crossing application maps}} {{ ::9.20.17_storm_hardening_-_f139_final.pdf |2017, September 20: Dear Neighbor letter}} {{ ::item2_f139_cup_plans_090617_rev_2.pdf |2017, September 6: Storm hardening plans revision 2}} {{ ::f-139_cross_arms_and_insulators_replacements_2016.pdf |2016 cross-arm and insulator replacements}} {{ ::np_v182_f139.pdf |2016: Northern Pass F-139 and V-182}}