H-123 115kV line {{ ::eversource_h-123_line.png?linkonly |line map}} {{::h123:h-123_k-165_and_380_merrimack_river_crossing.png?linkonly|2023 line map}} {{ :h123:h-123_2023-003-license.pdf |2023: license to cross}} {{ :m183:no_comment_from_pac_on_asset_condition_projects_march_2023.pdf |2023, March 16: PAC minutes; no comment from PAC on project}} {{ :2023_03_16_pac_minutes_final.pdf |2023, March 12: PAC minutes}} {{ ::eversource_139_and_others.pdf |2023, March 16: PAC presentation, replace 7 remaining wood structures with steel}} {{ ::4-cre-2023-003-license.pdf |2023, January 26: license for crossing}} {{ ::3-cre-2023-003-energy-staff-recommendation.pdf |2023 staff recommendation}} {{ ::1-cre-2023-003-application.pdf |2023, January 18: E$ petition for crossing public lands/waters; The proposed project for the H123 encompasses a static wire to optical ground wire replacement project.}} {{ ::2-cre-2023-003-application-exhibits.pdf |2022, November 19:petition exhibits also dated 2016}} {{ ::k165-h123_specialexemption_litchfield_final.pdf |2022, May: Application for Special Exception Litchfield}} {{ ::4-cre-2022-014-license.pdf |2022, May 23; license for crossing}} {{ ::3-cre-2022-014-energy-staff-recommendation.pdf |2022, May 4: staff recommendation; "The H123’s existing three phase conductors, a single OPGW wire, and a single static wire between Structures 201 and 202, whose specifications were identified on Exhibit 2 submitted by ES, will remain unchanged in the course of relocation to the replacement steel structures."}} {{ ::1-cre-2022-014-petition.pdf |2022, May 2: E$ petition to cross public waters/lands and replace one structure}} {{ ::2-cre-2022-014-petition-attachments.pdf |2022 petition attachments}} {{ :h123:h-123_2019-09-04_order_26290_summary.pdf |2019, September 4: order summary}} {{ :h123:h-123_2019-09-04_order_26290.pdf |2019, September 4: order}} {{ :h123:h-123_2019-08-27_eversource_revised_attachment.pdf |2019, August 27: revised attachment}} {{ :h123:h-123_019-06-28_staff_recommendation.pdf |2019, June 28: staff recommendation}} {{ ::h123_petition.pdf |2019, February 9; E$ petition for crossing Merrimack River; Shield Wire: 7#8 Alumoweld, Transmission Wire: 795 kcmil ACSR 36/1, ADSS Wire: ADSS 72 Fiber}} {{ ::h123_diagrams.pdf |2019, February 9: exhibits for petition}} {{ ::h-123_epa_reports.pdf |2018, December; EPA reports}} {{ ::e_22018-9_115kv_pac_submissions.pdf |2018, October 17; presentation to PAC, replace 29 structures at $6. million}} {{ ::k165_p145_.pdf |2016, January 7: TCA approval, apparently reliability}} {{ :h123:k-165_h-123_order_2012-03-08_order_no_25_333_nisi_granting_license.pdf |2012, March 8: Order Nisi; The project proposed in PSNH’s petition will entail the installation of a new 115kV transmission line (the H 123 Line) and the removal and replacement of a segment of an existing 115kV transmission line (the K165 Line).}} {{ :h123:h-123_exhibit_2011-11-30_psnh_appendix_a-exhibits_1_and_2.pdf |2011, November 30: crossing exhibits}} {{ ::k-165_and_or_h-123_pole_diagram_2011-11-30_psnh_diagrams-figures_1_and_2.pdf |2011, November 30: structure diagrams}}