====== H-141 115kV line ====== The H-141 line runs for 19.2 miles through Sandown, Danville, Fremont, Exeter, Stratham and North Hampton. Conductor is 336 ASCR 26/7 (19 m), 1272 ASCR (.1 m), 1590 ACSS (.2 m). {{ :may_18_2023_e_pac_lines_map.png?linkonly |2023, May 18: map showing line location}} {{ :draft_project_list_presentation-oct_2023.pdf |2023, October: ES Draft presentation to PAC}} {{ :a126:r193_-_a126_-_h141_des_permit_with_waivers.pdf |2023, June 27: DES permit waiving specific requirements of Env-Wq 1503.12(d)(1 & 2), Env-Wq 1503.21(d)(6 & 7), and Env-Wq 1504.09,}} {{ ::h141_r193_des_permit_with_waivers.pdf |2023, June 15: DES permit waiving specific requirements of Env-Wq 1503.12(d)(1 & 2), Env-Wq 1503.21(d)(6 & 7), and Env-Wq 1504.09}} {{ ::h141_r193_aot_6-16-2023.pdf |2023, June 16: AoT plans, Normandeau}} {{ ::h141_-_r193_aot_application_checklist.pdf |2023, June 15: AoT application checklist}} {{ ::h-141_2023.pdf |2023 May 25: Danville Planning Board: "The structure replacements were selected based on site visit evaluations conducted by Eversource and must be replaced for the transmission line to continue to function safely and reliably."}} {{ ::5-cre-2023-008-license-revision_memo.pdf |2023, May 23: license revision memo; The attached license has been revised to include additional information regarding the identification, specifications, and location of the subject utility lines as set forth in the Application requesting a Crossing License}} {{ ::6-cre-2023-008-revised-license.pdf |2023 May 23: revised license; "The proposed project for the Hl41 Line encompasses the replacement of existing wooden structures in Exeter, Brentwood, and Fremont. Structures 164,169,I70,I79,180, 181, 250, and 251 need to be replaced promptly to continue to function safely and reliably. Those structures will be replaced with weathering steel equivalents... The H 141's existing three-phase conductors, single OPGW wire, and single static wire will not be changed in the course of performing the steel structure replacements"}} {{ :a126:a_126_-_h141_-_s153_des_permit_with_waivers.pdf |2023, May 21: DES permit with waivers}} {{ :a126:a124_-_h141_-_s153_start_of_construction_notice.pdf |2023, May 23: Start of construction notice}} {{ ::2023_05_18_meeting_minutes_final.pdf |2023; May 18: PAC minutes}} {{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18, presentation to PAC, replace 35 out of 182 structures; $8.4 million}} {{ :a126:a126_-_h141_-_s153_aot.pdf |2023, May 18: Environmental Resources Map; 'Existing conductors and static wire will be transferred to new steel poles'}} {{ ::s153:5-9-2023_a-126_h-141_s-153.pdf |2023, May 9: construction plans}} {{ :a126:r193_-_a121_-_h141_aot_permit_application.pdf |2023, May 5: AOT permit application}} {{ ::a126:aot-2412_miscellaneous_r.pdf |2023, May 5: cover letter for Alteration of Terrain application. "The proposed project includes the replacement of 76 existing utility structures on the R193, A126, and H141 transmission lines that must be replaced because they have reached the end of their service life."}} {{ ::4-cre-2023-008-license.pdf |2023 April 26: crossing license; "The proposed project for the H141 Line encompasses the replacement of existing wooden structures in Exeter, Brentwood, and Fremont. Structures 164, 169,170,179, 180, 181, 250, and 251 need to be replaced promptly to continue to function safely and reliably. Those structures will be replaced with weathering steel equivalents that will be located within 10' of the original structure location. The H141's existing three phase conductors, single OPGW wire, and single static wire will not be changed in the course of performing the steel structure replacements"}} {{ ::3-cre-2023-008-energy-staff-recommendation.pdf |2023 April 20: staff recommendation}} {{ ::1-cre-2023-008-crossing_application.pdf |2023; April 19: crossing application}} {{ ::h141_-_r193_aot.pdf |2023, April 6: AoT application, GZA}} {{ :a126:a126_-_h141_-_s153_aot_checklist.pdf |2023, April 3: AOT checklist}} {{ ::h141_r193_aot_wetlands_damages_4-2023.pdf |2023 April: AoT permitting plans}} {{ ::2-cre-2023-008-exhibits_1_to_6.pdf |2023; March 6: crossing exhibits; state lands Exeter and Brentwood, Exeter River in Fremont}} {{ :a126:a126_-_h141_-_s153_aot_.pdf |2023, March 21: Alteration of Terrain application. "New steel poles will be installed. Existing conductors and static wire will be transferred to new steel poles."}} {{ ::22-049_2022-08-24_eversource_att-pet-approval-financing-transaction.pdf |2022, June 30: complete DE-22-049 document listing E$ proposed spending; $657,000.}} {{ ::cr-2021-011-eversource-crossing-order-of-notice.pdf |2021; October 19: crossing order of notice; replace structures 175-177, 182-184 and 186-188, State land in Brentwood}} {{ ::october_7_2021.pdf |2021; October 7: Brentwood planning board minutes}} {{ ::recommendation.pdf |2021; September 10: staff recommendation}} {{ :h141:h-141_2021-09-07_nhpuc_letter-transfer-nhdoe.pdf |2021, September 7: transfer from PUC to DOE}} {{ :h141:h-141_2021-06-17_eversource_petition_crossing.pdf |2021, June 17: crossing petition; "As part of its ongoing asset condition inspection program, Eversource determined that original wood structures 175 through 177 and 182, 183, 184, 1 186, 187 & 188 need to be replaced to continue to function safely and reliably"}} {{ :h141:h-141_2021-06-17_eversource_att_petition_crossing.pdf |2021, June 17: crossing exhibits}} {{ ::eversource_permit-by-notification-030921.pdf |2021; March 19: ES permit by notification}} {{ :h141:h-141_2020-04-01_order_26345_summary.pdf |2020, April 1: order summary}} {{ :h141:h-141_2020-04-01_order_26345.pdf |2020, April 1: order Nisi; The proposed modification to the water crossing begins at Structure 137 on the east side of the Squamscott River in Stratham and continues in a northwesterly direction to Structure 138 in Exeter. The crossing over state-owned land in Sandown begins at Structure 270 and continues in a westerly direction to Structure 271}} {{ :h141:h-141_2020-03-10_order_26338_summary.pdf |2020, March 10: order summary}} {{ :h141:h-141_2020-03-10_order_26338.pdf |2020, March 10: order Nisi; "Eversource seeks modification of its Hl41 Line, an existing overhead 115 kV electric transmission line over the Squamscott River between Stratham and Exeter, and across state-owned land in Sandown. Specifically, Eversource will replace four wooden pole structures with steel structures on portions of the H 141 Line that run over and across the Squamscott River and the state-owned land parcel."}} {{ :h141:h-141_2020-02-26_revised_staff_rec.pdf |2020, February 26: revised staff recommendation}} {{ :h141:h-141_2019-11-12_staff_recommendation.pdf |2019, November 12: staff recommendations}} {{ :h141:h-141_2019_.pdf |2019, July 16: order granting crossing of Exeter River:}} {{ :h141:h-141_2019-07-09_order_26270.pdf |2019, July 9: order; "Eversource filed the original petition and attachments in this matter on January 7, 2019. The Company filed revisions on May 10, 2019. Through the revised petition and attachments, Eversource requested two licenses pursuant to RSA 371:17 to construct and maintain electric transmission lines over Dudley Brook...The proposed modifications to the H141 Line begin at Structure #197 on the east side of Dudley Brook and will continue in a westerly direction to Structure #198...the total span from Structure #197 to Structure #198, after relocation, will be approximately 602 feet. Structures #198 and #222 are also changing in height from 70 to 75 feet above ground. The existing wooden structures will be replaced with new steel monopole structures and both transmission lines will be reconstructed using the existing conductors.}} {{ :h141:h-141_2019-07-09_order_26270_summary.pdf |2019, July 9: order summary}} {{ :h141:h-141_2019-07-01_rev_staff_rec.pdf |2019, July 1: revised staff recommendations}} {{ ::may_meeting_packet.pdf |2019; May: Exeter Conservation Commission meeting packet}} {{ :h141:h-141_2019-05-21_staff_rev_rec.pdf |2019, May 21: staff recommendations, revised}} {{ :h141:h-141_2019-05-17_staff_recommendation.pdf |2019, May 17: staff recommendations}} {{ :h141:h-141_2019-05-13_eversource_petition_cross_land_water_stratham_exeter_sandown.pdf |2019, May 13: crossing petition Swamscott River and Rockingham Rail Trail}} {{ :h141:h-141_2019-05-10_eversource_revisions_petition.pdf |2019, May 10: petition revisions}} {{ :h141:h-141_2019-05-10_eversource_att_revisions_petition.pdf |2019, May 10: crossing petition exhibit, revisions}} {{ :h141:h-141_2019-04-22_staff_rec.pdf |2019, April 22: staff recommendation}} {{ ::h141:h-141_19-007_2019-01-09_eversource_att_petition_crossing_exeter_river_chester.pdf |2019, January 19: crossing petition Exeter River, Chester|}} {{ ::h-141_19-008_2019-01-09_eversource_petition_crossing_exeter_river_danville.pdf |2019, January 9: crossing petition Danville}} {{ :h141:h-141_2019-01-09_eversource_att_petition_crossing_exeter_river_danville.pdf |2019, January 9: crossing exhibits Exeter River, Danville}} {{ :h141:h-141_2019-01-07_eversource_att_petition_crossing_brentwood.pdf |2019, January 7: crossing petition Brentwood}} {{ ::oct_17_2018_seven_115kv_asset_conditions_lines_partial.pdf |2018, October 17, presentation to PAC, replace 49 structures, $8.3 million}} {{ ::7192018_notice_of_decision-eversource.pdf |2018; July 17: notice of decision Sandown Planning Board}} {{ ::h-141_proposed_reliability_upgrade_10-2012.png?linkonly |2012, October, Proposed reliability upgrade}}