====== J-114 ====== {{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}} {{ :j114:aot-2407_plans_approved_stamp.pdf |2023, June 27: Alteration of Terrain stamped first page}} {{ ::j114_piscataquog_lac.pdf |2023, June 20: Piscataquog Local Advisory Committee meeting agenda}} {{ ::j114_des_permit_with_waivers.pdf |2023, June 21: DES permit waiving specific requirements of Env-Wq 1503.12(d)(1 & 2), Env-Wq 1503.21(d)(6 & 7), and Env-Wq 1504.09,}} {{ ::391:2023_05_18_meeting_minutes_final.pdf |2023, May 18 PAC minutes "A stakeholder suggested the ISO could take an “if you build it, they will come approach” but another stakeholder raised concern that this could be “building a bridge to nowhere.” "}} {{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18, presentation to PAC, replace 32 out of 49 structures and reconductor with Optical Ground Wire (OPGW); $9.7 million}} {{ :j114:prlac_5_16_23_minutes_june_agenda-1.pdf |2023, May 16th, PRLAC June Agenda}} {{ ::j114_aot_receipt_checklist.pdf |2023, May 9: AoT checklist}} {{ ::j114_environmental_resources_map_4-5-2023.pdf |2023, April 5: Environmental Resources map, GZA}} {{ ::22-049_2022-08-24_eversource_att-pet-approval-financing-transaction.pdf |2022, June 30: complete DE-22-049 document listing E$ proposed spending}} {{ :j114:j-114_2-24-23_license.pdf |2023, February 24: license to cross}} {{ :j114:staff-recommendation.pdf |2023, February 22: staff recommendation; the existing static wire will be replaced with a new OPGW wire and the installation of a second OPGW wire. The existing phase conductors will remain unchanged.}} {{ :j114:crossing_application_j114.pdf |2023, February 16: petition for crossing Piscataqua River and State lands; structure replacement and optical ground wire replacement and addition of a second optical ground wire}} {{ :j114:j114_exhibits.pdf |2022, November 4: crossing exhibits; 48 fiber.646 OPGW, 144 fiber .646 OPGW, 795 ASCR 36/1 Coot}} {{::j114:j-114_proposed_reliability_upgrade_10-2012.png?linkonly|2012, October, proposed reliability upgrade}}