L-175 115kV line {{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}} {{ :eversource_laminated_pole_problem.pdf |2021, March 17: presentation to PAC}} {{ ::02102021_m.pdf |2021, February 10): Deerfield Planning Board minutes and other correspondence}} {{ ::a2_eversourcce_115kv_wood_pole_and_shield_wire_replacements_2020_2023_rev1_redline.pdf |December 2019, 2020-2023 revisions PAC presentation}} {{ :12-18-2019_minutes.pdf |2019, December 18; Lee Zoning Board of Adjustment minutes}} {{ :l175:l-175_2010-02-19_order_no_25_073_order_nisi_granting_license.pdf |2010, February 19: Order Nisi}} {{ :l175:l-175_2010-02-12_staff_recommendation.pdf |2010, February 12; staff recommendation}} {{ :l175:l-175_2010-01-08_rev_attach_to_original_petition.pdf |2010, January 8: revised attachment to petition}} {{ :l175:l-175_09-277_2009-12-23_petition_for_line_construction_and_maintenance.pdf |2009, December 23: petition for crossing; "This project will remove all of the 266 ACSR and 795 ACSR and replace it with 1590 ACSR for the entire 12.89 mile length of the line between Deerfield and Madbury Substations...The existing L-175 structures, most of which are a mix of single pole and H-frame type construction, will be replaced with new structures designed to handle the increased loads of the larger conductor... The existing 266 ACSR 6/7 and 795 ACSR 36/1 phase wires will be replaced with 1590 ACSR 45/7. A majority of the line will be rebuilt utilizing single pole structures with davit arms. In these locations, the two existing static wires will be replaced with only one new optical ground wire, containing a 24 fiber optic cable, known as OPGW cable... Where the existing H-Frame type structures are being replaced with new H-Frame type structures or deadend structures, one 19#10 Alumoweld static wire and one OPGW cable will be installed.}} {{ :l175:l-175_09-277_2009-12-23_attach_to_petition_for_line_construction_and_maintenance.pdf |2009, December 23, attachment to petition}} {{ :l175:l-175_2009-12-23_attach_to_petition_for_line_construction_and_maintenance.pdf |2009, December 13, attachment to petition}}