[[asset conditions documents| Asset Condition documents]] [[Grid Maps|Grid Maps]] [[Grid Plans and Studies]] ====== Asset Condition Lines ====== ====== 345kV ====== [[307|307 $20 m.]] [[326|326 $34 m.]] [[367|367 $29 m.]] [[373|373 $16 m.]] [[379|379 $30. m.]] [[380|380]] [[381|381 $16 m.]] [[385|385 $19 m.]] [[391|391 $54 m.]] [[3135|3135 ]] ===== 115kV Lines ===== [[A-111|A-111 $31 m.]] [[A-126|A-126 $16.8 m.]] [[A-152|A-152 $24]] [[A-164|A-164 $67 m.]] [[A-253|A-253]] [[B-112 |B-112 $105 m.]] [[B-143|B-143 $17m. ]] [[C-129|C-129 $22 m.]] [[C-189|C-189 $13 m.]] [[C-196|C-196 $22 m.]] [[D-108|D-108 $6.7 m.]] [[D-121|D-121 $9 m.]] [[D-142|D-142 $53 m.]] [[E-115|E-115- $64 m.]] [[E-194|E-194 $8.7 m.]] [[F-139|F-139 $58 m.]] [[F-162|F-162 $22 m.]] [[F-190|F-190]] [[G-128|G-128 $25 m.]] [[G-146|G-146 $56 m.]] [[G-192|G-192 $8 m.]] [[H-123|H-123 $12 m.]] [[H-137|H-137 8 m.]] [[H-141|H-141 $27 m.]] [[I-158|I-158 $29 m.]] [[J-114|J-114 $9.7 m.]] [[J-125|J-125]] [[K-105|K-105 $20.6 m.]] [[K-165|K-165]] [[K-174|K-174 $24.8 m.]] [[L-163|L-163 $39 m.]] [[L-175|L-175 $23 m..]] [[L-176|L-176]] [[M-108|M-108/V-182 $13.4 m.]] [[M-127|M-127 $29. m.]] [[M-164|M-164 $6 m.]] [[M-183|M-183 $6 m.]] [[N-186|N-186]] [[O-154|O-154 $51 m.]] [[P-106|P-106 $5.6 m.]] [[P-145|P-145 $52 m.]] [[Q-171|Q-171 $15 m.]] [[Q-195|Q-195 $100 m.]] [[R-169|R-169 $8.4 m.]] [[R-187|R-187 $7.5 m.]] [[R-193|R-193 $7.7 m.]] [[S-136|S-136 $145 m.]] [[S-153|S-153 $5 m.]] [[S-188|S-188 $7.3 m.]] [[T-198|T-198 $19 m.]] [[U-181|U-181 $9.4 m.]] [[U-199|U-199 $51 m.]] [[V-182|V-182 $40 m.]] [[V-191|V-191 $10 m.]] [[W-157|W-157]] [[W-171|W-179 $81 m.]] [[X-104|X-104 $7 m.]] [[X-116|X-116 $24.6]] [[X-178|X-178 $11 m. project dropped and replaced with $387 m. project]] [[Y-138|Y-138 $8. m.]] [[Y-170|Y-170]] [[Z-119|Z-119 $23.4 m.]] [[Z-180|Z-180 $14.5 m.]]