====== M-108 aka V-182 Not on June 2023 Asset Condition List ====== {{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}} {{ :draft_project_list_presentation-oct_2023.pdf |2023, October: ES Draft presentation to PAC}} {{ ::c-189_g146_h137_m108_maps.pdf |August 2, 2023 Environmental Resources maps}} {{ :v182:transmittal_final_documents_re_external_v182_f139_transmission_line_rebuild_project.pdf |2023, June 5; email with AoT links}} {{ :v182:aot2388_rm.pdf |2023, May 29: DES AoT permit waiving specific requirements of Env-Wq 1503.12(d)(1 & 2), Env-Wq 1503.21(c)(2), and Env-Wq 1504.09,}} {{ :c189:m108_-_h137_-_c189_-_g146_start_of_construction_form.pdf |2023, May 22: Start of Construction form}} {{ ::c189_-_m108_-_h137_-_g146_des_permit_with_waivers.pdf |2023, May 22: DES permit waiving specific requirements of Env-Wq 1503.21(d)(6 & 7) and Env-Wq 1504.09, }} {{ ::c189_g146_m137_m108_5-22-2023.pdf |2023, May 22: Environmental Resources permit map set}} {{ ::c196_-_m108_-_h137_-_g146_wildlife_protection_plan.pdf |2023, April 28: Wildlife protection plan}} {{ ::v182-f139-project-fact-sheet.pdf |2023, April: project fact sheet}} {{ :v182:aot-2388_nhfg_conditions.pdf |2023, March 23: New Hampshire Fish & Game conditions}} {{ ::m108:license.pdf |2023, March 7: license to cross; Structures 2,11,12,27, and 29 through 32 replaced. "The Ml08's existing three phase conductors, single OPGW wire, and single static wire...will not be changed in the course of performing the steel structure replacements.}} {{ ::m108:staff-recommendation.pdf |2023, March 3: staff recommendation}} {{ ::m108:application.pdf |2023, February 23: petition to cross Merrimack River and Soucook River }} {{ ::m108:exhibits_1-7.pdf |2022, June 29: crossing exhibit, 1590 ASCR 45/7, 24 fiber OPGW .646" Brugg 93AY68ACS}} {{ ::g-146_and_m-108.pdf |2023, February 13: Pembroke CC minutes: "replacement of 65 existing wooden pole structures with significantly larger weathered-steel structures...Roads through these easements will require significant improvement, including the permanent placement of gravel along the roadbed...Additionally, 100’x100’ gravel work pads will be constructed at each pole location. After completion of the project 60’x30’ pads will be left at each of these sites."}} {{ :c189:m108_-_h137_-_c189_-_g146_aot_application_checklist.pdf |2023, February 1: AoT application checklist}} {{ :c189:c189_-_m108_-_h137_-_g146_aot_application.pdf |2023, January 27: AoT application}} {{ :p145:p145_-_c189_-_m180_-_h137_f_g_email.pdf |2022, October 3: Fish and Game email}} {{ :p145:p145_-_h137_-_m108_-_c189_aot_amended_application.pdf |2022, September 17: Amended AOT application}} {{ :v182:aot_stamped.pdf |2022, September 8: first page Alteration of Terrain, stamped}} {{ :p145:p145_h137_m108_c189_aot_9-8-2022.pdf |2022, September 8: Alteration of Terrain application}} {{ :v182:transmittal_of_final_documents_re_external_v182_transmission_line.pdf |2022, August 25: email with AoT links}} {{ :v182:aot_stamped-5.pdf |2022, August 12: first page AoT permit, stamped }} {{ ::v182:aot2209_rm.pdf |2022, August 19: DES AoT permit waiving waiving specific requirements of Env-Wq 1503.22(c)(3 - 8) and Env-Wq 1504.09, }} {{ :p145:p145_h137_m108_c189_aot_cover_8-12-2022.pdf |2022, August 12: AOT cover sheet}} {{ :p145:p145_h137_m108_c189_permitting_map_set_8-12-2022.pdf |2022, August 12 permitting maps set}} {{ :p145:p145_-_h137_-_m108_-_c189_des_permit_with_waivers.pdf |2022, August 12: DES permit with waivers for Env-Wq 1503.12(d)(1&2), Env-Wq 1503.21(d)(6&7), and Env-Wq 1504.09,}} {{ ::22-049_2022-08-24_eversource_att-pet-approval-financing-transaction.pdf |2022, June 30: complete DE-22-049 document listing E$ proposed spending}} {{ :v182:aot_stamped-3.pdf |2022, May 13; first page Alteration of Terrain, stamped}} {{ :eversource_franklin_northfield_canterbury_concord_des_wetlands_rfmi_5.13.23.pdf |2023, May 13: DES request for more information}} {{ :05.10.2023.pdf |2022, May 10: Concord Conservation Commission}} {{ ::4-cre-2022-009-license.pdf |2022, April 18: license for crossing}} {{ ::3-cre-2022-009-energy-staff-recommendation.pdf |2022, April: staff recommendation}} {{ ::cre-2022-009-order-of-notice.pdf |2022, April: order of notice}} {{ ::1-cre-2022-009-petition.pdf |2022, April: petition for crossing}} {{ ::2-cre-2022-009-petition-attachments.pdf |2022, April: petition attachments}} {{ :v182:m108_v182_puc.pdf |2022, March 23: petition for crossing}} {{ ::np_v182_f139.pdf |2016: Northern Pass F-139 and V-182}}