PAC Studies and Transmission Planning Guides [[https://www.iso-ne.com/static-assets/documents/100008/2024_02_14_pac_2050_transmission_study_final.pdf| ISO 2050 transmission grid "needs" study that does not contain the word 'conservation.']] {{ ::a10_2023_08_16_pac_rsp23_draft_for_comment.pdf |2023, August 10: ISO regional system plan draft for comment}} {{ :pac:a4_ferc_order_1000_05_18_18_project_list_presentation.pdf |2018, May 18: FERC order 1000}} {{ :pac:a3_public_policy_transmission_upgrade_process_june_2017.pdf |2017, June 21 : Public policy transmission upgrade process}} {{ :pac:a7_2017_economic_study_request_clf.pdf |2017, April 3: CLF Request for 2017 Economic Study to Explore Least-Cost, Emissions- Compliant System Topologies}} {{ :pac:a4_transmission_planning_process_guide_presentation.pdf |2016, December 21: Transmission Planning Process Guide - Update}} {{ :pac:a4_review_of_transmission_planning_assumptions.pdf |2016, December 14: Review of Transmission Planning Assumptions}} {{ :pac:2016_economic_study_comments_20161212.pdf |2016, December 12: Synapse comments}} {{ :pac:2016_economic_studies_high_level_transmission_costs_rev1.pdf |2016, October 19: Preliminary high order of magnitude transmission development costs }} {{ :pac:a4_transmission_planning_process_guide_redlines.pdf |2016, September 8: Transmission Planning Process Guide}} {{ :pac:2016_economic_study_synapse_comments.pdf |2016, September 2: Synapse, Economic Study Results to date }} {{:pac:a2_transmission_planning_process_guide_soultions_study_and_competitve_solutions_process_presentation.pdf |2016, March 31: Transmission Planning Process Guide Solution Development, Rev. 1}} {{ :pac:nepool_economic_study_request_scenario_analysis.pdf |2016, March 31: NEPOOL Scenario Analysis Proposal}} {{ :pac:a2_fca11_zonal_boundary_determinations.pdf |2016, March 22: Forward Capacity Auction 11 Transmission Transfer Capabilities & Capacity Zone Development}} {{ :pac:a2_transmission_planning_process_guide_redline.pdf |2016, March 15: © ISO New England Inc. System Planning Transmission Planning Process Guide}} {{ :pac:a7_transmission_planning_process_guide_needs_assessment_rev1.pdf |2016, January 21: Transmission planning guide needs assessment}} {{ :pac:a9_fca_11_zonal_interfaces.pdf |2016, January 21: Forward Capacity Auction 11 Zonal Development: Scope of Work}} {{ :pac:a2_review_of_transmission_planning_assumptions.pdf |2015, December 14: Conceptual Methodology for Base Case Assumption Quantification}} {{ :pac:a5_transmission_planning_process_guide_qtps_enrollment_and_qualified_sponsor.pdf |2015, June 10:Transmission planning process guide}} {{ :pac:a5_transmission_planning_assumptions_and_methods.pdf |2015, April 28: Review of Transmission Planning Assumptions and Methods}} {{ ::pac:2012_eco_study.pdf |2012, May 16: Economic Study of requests}}