====== Project Plans ====== ===== Basic project plansheets and structure height changes removed from Eversource "site" some time around mid-April, 2025 ===== {{ :x178:project_information_form_-_reel_brook_trail_kinsman_ridge_trail_relocations.pdf |2025, April: Re-routing of Reel Brook Trail, apparently around the existing trail which Eversource plans to turn into a road with two cross-roads, to access the X-178}} {{ :x178:02262025_x178-2_spn_rfmi_response.pdf |2025, February 26: GZA response to questions about geotechnical boring in WMNF}} {{ :x178:2025-2-11_gza_boring_plan.pdf |2025, February 11: GZA boring plan Thornton dump}} {{ :x178:02072025_incompl_app.pdf |2025, February 7: email re. incomplete application for geotechnical boring in WMNF}} {{ :x178:project_vicinity_map_-_eversource_x178-1_transmission_line_rebuild.pdf |2025, January 22: Forest Service project vicinity map, X-178 (1)}} {{ :x178:2024-12-23_kp_comment_on_eversource_waivers_from_permit_requirements.pdf |December 23: Eversource waivers from DES permit requirements}} {{ :x178:x-178_boring_plan.pdf |2025, January 20: Statutory Permit by Notification for geotechnical borings of unstated depth on the X-178 easement in White Mountain National Forest."Threats to both the medium level fen system and poor level fen/bog system include changes to hydrology, especially those that result in pooling, increased nutrient input and increased sedimentation." Borings postponed to Q1, 2026}} {{ :x178:easton_variance_application_11-12-24_opt.pdf |2025, January 7: Eversource application for a variance from Easton's structure height restriction.}} {{ :x178:easton_site_plan_review_app_e_.pdf |2025, January: Eversource Site Plan Review application to Easton}} {{ :x178:easton_variance_application_11-12-24_opt.pdf |2025, January 7: Eversource application for a variance from Easton's structure height restriction.}} {{ :x178:easton_site_plan_review_app_e_.pdf |2025, January: Eversource Site Plan Review application to Easton}} {{ :x178:final-steep_slopes-111224_opt.pdf |2025, January: Eversource application for a Conditional Use Permit for Easton Steep Slopes areas}} {{ :x178:final-04.0191410.39-x178-easton-cup-111224_opt.pdf |2025, January: Eversource application for a Conditional Use Permit for Easton's Wetlands Conservation District Overlay District}} {{ :x178:x178_permitting_plans_phase_2_081224_1_.pdf |2024, November 18 (discovered): X-178 (2) Phase 2 permitting plans}} {{ :x178:2024-11-18_email_and_e_presentation.pdf |2024, November 18: email and Eversource presentation on Thornton Landfill Dump. ACSS conductor not good for long spans. Code clearance for pedestrian areas 16'}} {{ :x178:x178_permitting_plans_wmnf_grading_091224.pdf |2024, September 12: Road Grading White Mountain National Forest}} {{ :x178:x178_permitting_plans_phase_2_081224_bog_markings.pdf |2024, August 12: X-178 (2) Phase 2 Permitting Plans}} {{ :x178:x178_permitting_plans_phase_2_081224_1_.pdf |2024, August 12: Section 2, Phase 2 maps with 2' lidar-derived contour lines. White Mountain National Forest.}} {{ :x178:es-x178-6-3-planset-stamped.pdf |2024, August (received): post-construction grade of roads, pull pads and crane pads, Easton Phase 1}} {{ :x178:final_aot_document.pdf |2024, August 6 released by a 91-a: X-178 (2) Phase 1 Alteration of Terrain application, dated March 20 2024, permitted/approved 5/28/2024, permit good until 5/28/2029.}} {{ :x178:attachment_1_-_x178-1_plans_-_wetland_permitting_plans_6-7-2024.pdf |2024, August 6; released to the public by a 91-a: digital X-178-1 wetland permitting plans dated June 7, 2024}} {{ :x178:x-178_-exhibits.pdf |2024: Eversource crossing exhibits and line profile drawings}} {{ :x178:2024-07-23_re_revised_aot_permitting_plans_-_eversource_x178-1_transmission_line_rebuild_project_-_nhdes_file_20240320-60.pdf |2024, July 23: Revised AoT permitting plans}} {{ :x178:wmnf_x178-1_transmission_line_rebuild_project_information_form.pdf |2024, April 2: Eversource Small Projects Day application for line rebuild on Section 1 of X-178, Woodstock.}} {{ :x178:x-178_easton_plans.pdf |2024: Environmental Permitting Planset, Easton, no wetlands scientist stamp.}} {{ :eversource_x-178-2_project_proposal_overview_map.pdf |2023, October: WMNF overview map}} {{ :x178-1-draft-map-set.pdf |2023, July 26: X-178 (1) Draft Map Set}} {{ :x178:x178-3-draft-map-set.pdf |2023, July 26: X-178 (3), Draft Map Set}} {{ :x178:x178-2-draft-map-set_7-25-2023.pdf |2023, July 25: X-178 (2) Draft Map Set}} {{ :x178:x178_spn_plan_compiled-1.pdf |2021, February 18: Transmission line aerial overview plans, GZA}} {{ :x178:x178_spn_plan.pdf |2020, January 30: Aerial overview plan}}