====== Q-171 115kV line ====== {{ ::a00_051623_rc_agenda_p145_p106_q171.pdf |2023, May 16: NEPOOL Reliability meeting agenda}} {{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}} {{ ::c196_-_a252_-_q171_des_to_gza_.pdf |2023, January 5: DES and GZA email}} {{ ::c196_-_q171_-_a253_des_permit_with_waivers.pdf |2023, January 9 DES permit with waivers from requirements of Env-Wq 1503.12(d)(1), Env-Wq 1503.21(d)(6) and (7), and Env-Wq 1504.09}} {{ ::a04_es_asset_condition_wood_structure_replacements.pdf |2023, January 19, presentation to PAC, 29 out of 145 structures replaced, $6.2 m.}} {{ ::c196_-_q171_-_a253_des_permit_with_waivers.pdf |2023, January 9 DES permit with waivers from requirements of Env-Wq 1503.12(d)(1), Env-Wq 1503.21(d)(6) and (7), and Env-Wq 1504.09}} {{ ::c196_-_a252_-_q171_des_to_gza_.pdf |2023, January 5: DES and GZA email}} {{ :c196:c196_q171_a253_fish_and_game_email.pdf |2022, December 28: emails, Fish & Game, DES, E$}} {{ ::c196_-_q171_-_a253_f_g_conditions.pdf |2022, December 19 : Fish & Game Wildlife recommendations}} {{ ::c196_-_q171_des_permit_with_waivers.pdf |2022, September 2: DES permit with waivers from Env-Wq 1503.12(d)(1&2), Env-Wq 1503.21(d)(6&7), and Env-Wq 1504.09}} {{ ::aot_2215_start_of_construction.pdf |2022, September 2: Start of Construction Notification}} {{ ::c196:4-cre-2022-018-license.pdf |2022, August 15: permit}} {{ ::c196:3-cre-2022-018-energy-staff-recommendation.pdf |2022, July 27: staff recommendation}} {{ ::c196:1-cre-2022-018-petition.pdf |2022:July: E$ petition for river crossing}} {{ ::c196:2-cre-2022-018-petition-attachments.pdf |2022, petition attachments}} {{ ::c196_-_q171_cover_page_aot.pdf |2022, July 7: AOT transmittal cover page}} {{ ::c196_q171_surface_and_groundwater_resources_6-28-2022.pdf |2022, June 28: Surface and Groundwater resources}} {{ ::c196:a3_eversource_new_hampshire_asset_conditions_wood_structure_replacement.pdf |2022, June 15:presentation to PAC}} {{ ::1-cre-2022-020-petition.pdf |2022: petition}} {{ ::2-cre-2022-020-petition-attachments.pdf |2022: petition attachments}} {{ ::3-cre-2022-020-energy-staff-recommendation.pdf |2022: staff recommendation}} {{ ::4-cre-2022-020-petition-attachments-revised.pdf |2022: petition attachments revised}} {{ ::5-cre-2022-020-staff-recommendation-revised.pdf |2022: staff recommendations revised}} {{ ::6-cre-2022-020-license.pdf |2022: license}} {{ ::cre-2022-020-order-of-notice.pdf |2022: order of notice}} {{ ::document.pdf |2021, December 9: Town of Bow, Conditional Use Permit and public hearing on wetlands damage and after-the-fact truck access}} {{ ::q171_town_of_bow.pdf |2020:Town of Bow}} {{ :c196:c-196_6-6-1975_glen_lake_crossing.pdf |1996, June 6: petition for crossing Glen Lake; "reconstruct two parallel 115 KV electric transmission lines of wires and cables over and across Glen Lake in the Town of Goffstown, New Hampshire, which are part of its 115KV system connecting the Greggs Substation in Goffstown and the Merrimack Substation in Bow;"}}