====== U-199 115kV line ====== {{ :u199:24-087-2025-06-06-nhdoe-testimony-devirgilio-1.pdf |2025, June 6: DOE witness DeVergilio testimony in support of Eversource with no evidence presented.}} {{ :u199:24-087-2025-06-06-nhdoe-position-statement.pdf |2025, June 6: After pretending to oppose Eversource and support Bethlehem, NH DOE shows its true position as a captured agency}} {{ :u199:24-087-2025-06-06-nhdoe-att-testimony-devirgilio.pdf |2025, June 6: DeVergilio resume and more responses to questions.}} {{ :u199:24-087-2025-05-09-bethlehem-notice-appearance-request-service-list-change.pdf |2025-5-9: Bethlehem re-appears in PUC docket}} {{ :u199:u-199_cost_increase.pdf |2025, March: U-199 cost increases from $51 m. to $71 m.}} {{ :u199:mesa_4-5-2025.jpg?linkonly |2025, April 5: construction mesas with rip-rap slopes}} {{ :u199:24-087-2025-04-01-bethlehem-withdrawal-notice-appearance.pdf |2025, April 1: Bethlehem legal counsel withdrawal from docket.}} {{ :u199:24-087-2025-03-31-eversource-motion-amend-petition-establish-procedural-schedule.pdf |2025, March 31: Eversource request to withdraw X-178 from docket.}} {{ :u199:2025-2-25_comment_to_puc_re_u-199_action_and_inaction.pdf |2025, February 2: Comment to PUC on two months of inactivity on the docket while the U-199 construction is moving toward Bethlehem.}} {{ :u199:pxl_20250108_191603642.jpg?linkonly |2025, January 8: matting}} {{ :u199:pxl_20250108_191609666.jpg?linkonly |2025, January 8: construction}} {{:u199:pxl_20241221_160127285_2.jpg?linkonly|2024, December 21: construction}} {{ :u199:cre-2024-007-license.pdf |2024, August 6: crossing license}} {{ :u199:u199-structure-heights-littleton.pdf |2024: structure heights, Littleton, withheld for months by Eversource}} {{ :u199:u199_line_rebuild_i_3_9_letter_es_24_t02.pdf |2024, February 14: no adverse effects to system from U-199 rebuild}} {{ :u199:2023_05_18_meeting_minutes_b112_-_u199_-_q195l.pdf |2023, May 18: PAC meeting minutes}} {{ :u199:u199-structure-heights-bethlehem.pdf |2024, May: Structure heights existing and proposed, Bethlehem, withheld for months by Eversource}} {{ :u199:u199-project-intro-fact-sheet.pdf |2024, May 16: Project Introduction "Fact Sheet."}} {{ :u199:u199-project-update.pdf |2023, October 18: "Dear Neighbor" letter}} {{ ::u199-permitting-plans.pdf |2023, October 10: DRAFT permitting plans}} {{ ::2023_05_18_meeting_minutes_final.pdf |2023 May 18 PAC minutes, Replace 104 wood and 1 steel structures with new steel structures, Re-conductor 9.75 miles of 795ACSR with 1272 ACSS, Install 19.5 miles of OPGW (2 x 9.75 mi), Estimated PTF Cost: $51.18M (-25% / +50%), Projected In-service Date: Q2, 2026}} {{ ::b112-u199-q195_rebuild_presentation.pdf |2023, May 18, presentation to PAC}} {{ :u199:u199-project-introduction-letter.pdf |2023, February 10: "Dear Neighbor" letter}} {{ ::22-049_2022-08-24_eversource_att-pet-approval-financing-transaction.pdf |2022, June 30: complete DE-22-049 document listing E$ proposed spending}} {{ ::u199:u-199_2014_a_mile_line_rebuild_and_river_crossing.pdf |2014, December 18:PSNH letter to PUC re changes in crossing}} {{ ::u199:u-199_2015_revised_crossing.pdf |2015, April 13: Order Nisi, Ammonoosuc River}} {{ ::u199:u-199_crossing_ammonoosuc_2014.pdf |2014: exhibits for crossing Ammonoosuc River, steel structures, conductor remains 795}}