F-162

2023, October:RSP asset condition list

2023, June 15 PAC minutes

2023, June 15, PAC presentation

2023, November 27: License

2023, November 20: staff recommendation

2023, November 6: crossing application; "In addition to the structure replacements and the Greggs substation expansion, the existing pole top static wire is being removed and replaced with an OPGW wire “48F ᴓ 0.646” AFL DNO-11852”. The three existing conductors and the second existing OPGW wire at the crossing spans shall remain unchanged in the course of the structure replacements."

2023: crossing exhibits; 1590 ASCR 45/7 Lapwing, 48 fiber .646 AFL OPGW, 84 fiber OPGW

1995, September 6: two crossings as identified in Appendix 2 of the petition and on drawings D-7649-383/Exhibit 1, D-7649-383/Exhibit 2, D-7694-384/Exhibit 1, and D-7694-384/Exhibit 2, are over the North Branch of the Piscataquog River in New Boston, NH.

1976: Order, Piscataqua River crossing; reconstructing 115 kv transmission lines over and across the north branch of the Piscataquog river in New Boston. Part of the company's Greggs to Jackman 115 kv transmission line

1976: reconstructing line' for the purpose of reconstructing its Greggs to Jackman (Goffstown-Hillsborough) 115 kv transmission line because of the age and condition of the line, which was original constructed prior to 1930. Three crossing of the Contoocook River, two of the Piscataqua and one of Beaver Pond.