User Tools

Site Tools


91-a_august_2020_to_dncr_re.construction_of_kelsey_and_baseline_studies

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
91-a_august_2020_to_dncr_re.construction_of_kelsey_and_baseline_studies [2023/04/01 06:02] sigridundset91-a_august_2020_to_dncr_re.construction_of_kelsey_and_baseline_studies [2023/08/30 07:50] (current) – external edit 127.0.0.1
Line 1: Line 1:
  
-{{ :kcon:so-called_noise_baseline_study.pdf |7-3-02; so-called Noise Baseline Study}}+{{ :kcon:so-called_noise_baseline_study.pdf |7-3-02; so-called Noise Baseline Study, done for West Side ATV Road}}
  
-{{ :kcon:des_study_benthic_fish.pdf |1-24-07Benthic Fish study}}+{{ :nash2002:des_study_benthic_fish.pdf |2003Water quality, fish and benthic macroinvertebrates study done for West Side ATV Road. "It is strongly recommended that periodic site investigations and maintenance be performed on the ATV trail and at surface intersections with water courses in order to minimize water quality impacts."}}
  
 {{ ::kcon:2013_gamache_to_simpkins_request_for_kn_approval_with_team_reports.pdf |3-25-13: Chris Gamache wants to ask Brad Simpkins of DF&L to allow an ATV trail through Kelsey Notch}} {{ ::kcon:2013_gamache_to_simpkins_request_for_kn_approval_with_team_reports.pdf |3-25-13: Chris Gamache wants to ask Brad Simpkins of DF&L to allow an ATV trail through Kelsey Notch}}
Line 19: Line 19:
  
 {{ :kcon:map_of_nash_stream_sf.pdf |Map of Nash Stream SF with proposed Kelsey Notch Trails/Roads locations and key missing for the solid black lines throughout the Forest}} {{ :kcon:map_of_nash_stream_sf.pdf |Map of Nash Stream SF with proposed Kelsey Notch Trails/Roads locations and key missing for the solid black lines throughout the Forest}}
- 
-{{ :kcon:mou_with_metallak_for_kelsey_notch_trails.pdf |5-22-13; MOU between DNCR and 'Metallak' ATV Club for Kelsey Notch ATV Trails/Roads}} 
  
 {{ :kcon:slmt_13-01-04_nash_stream_columbia_ohrv_2_.pdf |1-4-13; State lands Management Team response; Maggie Machinist }} {{ :kcon:slmt_13-01-04_nash_stream_columbia_ohrv_2_.pdf |1-4-13; State lands Management Team response; Maggie Machinist }}
Line 27: Line 25:
  
 {{ :kcon:woodburn_and_sandborn_ask_cord_to_approve_kn.pdf |4-10-13; Jeff Woodburn and Andy Sandborn ask CORD to approve Kelsey Notch ATV 'Trails' calling trails "minor" and claiming economic benefit without any supporting documentation.}} {{ :kcon:woodburn_and_sandborn_ask_cord_to_approve_kn.pdf |4-10-13; Jeff Woodburn and Andy Sandborn ask CORD to approve Kelsey Notch ATV 'Trails' calling trails "minor" and claiming economic benefit without any supporting documentation.}}
 +
 +{{ :kcon:mou_with_metallak_for_kelsey_notch_trails.pdf |5-22-13; MOU between DNCR and 'Metallak' ATV Club for Kelsey Notch ATV Trails/Roads}}
91-a_august_2020_to_dncr_re.construction_of_kelsey_and_baseline_studies.1680343372.txt.gz · Last modified: 2023/08/30 07:51 (external edit)

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki