d-121
This is an old revision of the document!
D-121 115kV line
2023, May 23: Alteration of Terrain plans, water resources
2023, May 18, presentation to PAC, replace 18 out of 154 structures; $5. million
2023, May 18: map showing line location
2023, May 14: DES permit with waivers
2023, March 28: Alteration of Terrain application
2023, March 23: Water Resources maps
2021, December 9:Town of Bow public hearing on wetlands damage and after-the-fact truck access
2021, September 28: prehearing order
2021, August 18: AoT cover sheet
2021, August 18: DES permit waiving specific requirements of Env-Wq 1504.09,
2021, August 18: Surface and Groundwater maps
2021, June 16: presentation to PAC
d-121.1697702987.txt.gz · Last modified: 2023/10/19 04:09 by sigridundset