User Tools

Site Tools


des

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
des [2022/01/28 05:24] sigridundsetdes [2023/08/30 07:50] (current) – external edit 127.0.0.1
Line 1: Line 1:
  
-====== 91-a 9-2020: Responses from DES ======+====== 91-a 9-2020: Responses from DES re. stream crossing permits on Ride the Wilds trails ====== 
  
-{{::des:90_new_bridge_cloutier_near_nash_stream..jpg?linkonly|Map showing 90' bridge over Nash Stream and Southern Connector plan}} 
  
 {{ :des:2014-03128_simm_s_stream_brook_dred_and_wagner_land_brook.pdf |November 18, 2014: DES permission for two bridges over Simm's Stream, Kelsey Notch, Columbia and Dixville, N.H., on State land and Wagner Forestry land.}} {{ :des:2014-03128_simm_s_stream_brook_dred_and_wagner_land_brook.pdf |November 18, 2014: DES permission for two bridges over Simm's Stream, Kelsey Notch, Columbia and Dixville, N.H., on State land and Wagner Forestry land.}}
 +
 +{{ :des:2015-1579_simm_s_stream_two_bridges.pdf |June 26, 2015: Permit from DES for replacement of two bridges across Simm's Stream}}
  
 {{ :des:2016-02601_two_culverts_kelsey_notch.pdf |September 15, 2016: Permit from DES for replacement of two culverts in Kelsey Notch, Nash Stream State Forest.}} {{ :des:2016-02601_two_culverts_kelsey_notch.pdf |September 15, 2016: Permit from DES for replacement of two culverts in Kelsey Notch, Nash Stream State Forest.}}
  
-{{ :des:2015-1579_simm_s_stream_two_bridges.pdf |June 262015Permit from DES for replacement of two bridges across Simm's Stream}}+{{ :des:2017-03520_repair_bridge_abutment_after_storm_pea_brook_portland_pipeline_shelburne.pdf |December 42017: DES permit for bridge abutment repair after storm, Pea Brook, Shelburne}}
  
-{{ :des:2017-03520_repair_bridge_abutment_after_storm_pea_brook_portland_pipeline_shelburne.pdf |2017Application for DES permit for bridge abutment repair after storm, Pea Brook, Shelburne}}+{{ :des:2018-03333_undermined_bridge_abutments_stearns_brook_success.pdf |October 26, 2018: DES permit for repair of undermined bridge abutments Stearn'Brook, Success, N.H.}}
  
-{{ :des:2018-03333_undermined_bridge_abutments_stearns_brook_success.pdf |2018 Application for DES permit for undermined bridge abutments repair Stearn'Brook, Success, N.H.}}+{{ :des:2018-03524_washed_out_bridge_abutment_horne_brook_success.pdf |November 21, 2018:DES permit for replacement of washed out bridge abutment, Horne Brook, Success, N.H.}}
  
-{{ :des:2018-03524_washed_out_bridge_abutment_horne_brook_success.pdf |2018 Applications for DES permit for replacement of washed out bridge abutment, Horne Brook, Success, N.H.}}+{{ :des:2019-01426_90_new_bridge_cloutier_near_nash_stream.pdf |May 15, 2019: DES permit for 90' bridge crossing Nash Stream on Cloutier propertyApplications includes "build new trails for east and west ramps...Upgrade existing snowmobile trails leading to the bridge to ATV standards." Project map labels "new connector trail." Permit states: "Your notice is sufficient to start work provided...You are not constructing a trail for current or future development.}}
  
-{{ :des:2019-01426_90_new_bridge_cloutier_near_nash_stream.pdf |Application for DES permit for 90' bridge crossing Nash Stream on Cloutier property}}+{{::des:90_new_bridge_cloutier_near_nash_stream..jpg?linkonly|Map showing 90' bridge over Nash Stream and Southern Connector plan}}
  
 Other relevant documents: Other relevant documents:
des.1643365473.txt.gz · Last modified: 2023/08/30 07:51 (external edit)

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki