e-194
This is an old revision of the document!
E-194 115kV line
2023, August 7: email re alteration of terrain permit application
2023, June 15, Portsmouth wetlands permit
2023, July 29: DES permit with waivers
2023, May: Alteration of Terrain application
2023, May 18, presentation to PAC, replace 21 out of 70 structures; $8.7 million
e-194.1698046697.txt.gz · Last modified: 2023/10/23 03:38 by sigridundset