G-146 $58 m.
2023, October: ES Draft presentation to PAC
August 2, 2023 Environmental Resources maps
June 2023 PAC presentation
2023, May 22: Start of Construction form
2023, May 22: DES permit waiving
specific requirements of Env-Wq 1503.21(d)(6 & 7) and Env-Wq 1504.09,
2023, May 22: Environmental Resources permitting maps
2023, April 28: Wildlife protection plan
2023, February 13: Pembroke CC minutes: "replacement of 65 existing wooden pole structures with significantly larger weathered-steel structures...Roads through these easements will require significant improvement, including the permanent placement of gravel along the roadbed...Additionally, 100’x100’ gravel work pads will be constructed at each pole location. After completion of the project 60’x30’ pads will be left at each of these sites."
2023, February 1: AoT application checklist
2023, January 27: AoT application
G-146: Why are we doing this?
2016, January 7: TCA approval, apparently reliability
2015 Testimony Northern Pass