User Tools

Site Tools


littleton

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
littleton [2023/07/31 03:12] sigridundsetlittleton [2023/08/30 07:50] (current) – external edit 127.0.0.1
Line 44: Line 44:
  
 {{ ::february_3_2022_letter_to_dncr_fhwa_board_of_trails_and_littleton.pdf |February 3, 2022, letter to Board of Trails, DNCR, FHWA and Town of Littleton: "The Ammonoosuc Rail Trail (non-TE funded section) does  not end at Industrial Park Rd. DNCR has known this since at least 2017." }} {{ ::february_3_2022_letter_to_dncr_fhwa_board_of_trails_and_littleton.pdf |February 3, 2022, letter to Board of Trails, DNCR, FHWA and Town of Littleton: "The Ammonoosuc Rail Trail (non-TE funded section) does  not end at Industrial Park Rd. DNCR has known this since at least 2017." }}
 +
 +{{ ::simply_would_not_be_safe_industrial_park_road.png?linkonly |April 1, 2022 "Trails Bureau does not believe the town will allow OHRV use on Industrial Park Road...It simply would not be safe."}}
  
 {{ :littleton:91-a_k._pastoriza.pdf |91-a to Littleton, 2022}} {{ :littleton:91-a_k._pastoriza.pdf |91-a to Littleton, 2022}}
littleton.1690787547.txt.gz · Last modified: 2023/08/30 07:51 (external edit)

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki