M-108 aka V-182 Not on June 2023 Asset Condition List
2023, October: ES Draft presentation to PAC
August 2, 2023 Environmental Resources maps
2023, June 5; email with AoT links
2023, May 29: DES AoT permit waiving specific requirements of Env-Wq 1503.12(d)(1 & 2), Env-Wq 1503.21(c)(2), and Env-Wq 1504.09,
2023, May 22: Start of Construction form
2023, May 22: DES permit waiving
specific requirements of Env-Wq 1503.21(d)(6 & 7) and Env-Wq 1504.09,
2023, May 22: Environmental Resources permit map set
2023, April 28: Wildlife protection plan
2023, April: project fact sheet
2023, March 23: New Hampshire Fish & Game conditions
2023, March 7: license to cross; Structures 2,11,12,27, and 29 through 32 replaced. "The Ml08's existing three phase conductors, single OPGW wire, and single static wire...will not be changed in the course of performing the steel structure
replacements.
staff-recommendation.pdf
application.pdf
exhibits_1-7.pdf
2023, February 13: Pembroke CC minutes: "replacement of 65 existing wooden pole structures with significantly larger weathered-steel structures...Roads through these easements will require significant improvement, including the permanent placement of gravel along the roadbed...Additionally, 100’x100’ gravel work pads will be constructed at each pole location. After completion of the project 60’x30’ pads will be left at each of these sites."
2023, February 1: AoT application checklist
2023, January 27: AoT application
2022, October 3: Fish and Game email
2022, September 17: Amended AOT application
2022, September 8: first page Alteration of Terrain, stamped
2022, September 8: Alteration of Terrain application
2022, August 25: email with AoT links
2022, August 12: first page AoT permit, stamped
2022, August 19: DES AoT permit waiving waiving specific requirements of Env-Wq 1503.22(c)(3 - 8) and Env-Wq 1504.09,
2022, August 12: AOT cover sheet
2022, August 12 permitting maps set
2022, August 12: DES permit with waivers for Env-Wq 1503.12(d)(1&2), Env-Wq 1503.21(d)(6&7), and Env-Wq 1504.09,
2022, June 30: complete DE-22-049 document listing E$ proposed spending
2022, May 13; first page Alteration of Terrain, stamped
2023, May 13: DES request for more information
2022, May 10: Concord Conservation Commission
2022, April 18: license for crossing
2022, April: staff recommendation
2022, April: order of notice
2022, April: petition for crossing
2022, April: petition attachments
2022, March 23: petition for crossing
2016: Northern Pass F-139 and V-182