Previous revision
326 [2023/10/25 07:05] sigridundset326 [2024/03/27 07:11] (current) sigridundset
Line 1: Line 1:
 345kV Line 326 345kV Line 326
- 
- 
-{{ :326:326_3-17_2022_order.pdf |}} 
- 
-{{ :326:326_4-15-2022.pdf |}} 
  
  
Line 20: Line 15:
  
 {{:a3_eversource_new_hampshire_asset_conditions_wood_structure_replacement.pdf|2022, June 15 presentation to PAC }} {{:a3_eversource_new_hampshire_asset_conditions_wood_structure_replacement.pdf|2022, June 15 presentation to PAC }}
 +
 +{{ :326:326_4-15-2022.pdf |2022, April 15: application to Town of Hudson for conditional use permit}}
 +
 +{{ :326:326_-2022-010-order-of-notice.pdf |2022, April 11: Order of Notice,line has three ACSR 850.8 Kcmil phase conductors, a single 7#8 Alumoweld static wire and a single 0646" OPGW wire will be transferred to the replacement structures.}}
  
 {{ :326:326_380_aot_permit_3-29-2022_.pdf |2022, March 29: AoT application, GZA}} {{ :326:326_380_aot_permit_3-29-2022_.pdf |2022, March 29: AoT application, GZA}}
Line 30: Line 29:
  
 {{ ::2-cre-2022-010-petition-attachments.pdf |2022, March 29: petition attachments}} {{ ::2-cre-2022-010-petition-attachments.pdf |2022, March 29: petition attachments}}
 +
 +{{ :326:326_3-17_2022_order.pdf |2022, March 17: Order re. petition for crossing rivers/public lands}}
  
 {{ ::3-cre-2022-010-energy-staff-recommendation.pdf |2022: staff recommendations}} {{ ::3-cre-2022-010-energy-staff-recommendation.pdf |2022: staff recommendations}}
Line 37: Line 38:
 {{ ::326_345kv_line_diagram.pdf |line diagram}} {{ ::326_345kv_line_diagram.pdf |line diagram}}
  
-{{ ::cre-2022-010-order-of-notice.pdf |2022order}} +{{ :326:326_.pdf |2021, May 4Order, The Company proposes to replace existing Structure 5 with a newly constructed steel support structure. The three existing conductors and the existing static wire and optical ground wire (OPGW) on the line will be transferred to the new structure. The Company also seeks an after-the-fact license for the 2018 replacement of Structure 4 at the same crossing location}}
- +
-{{ ::de-21-048-order-26-474.pdf |2021: order}}+
  
 {{ ::a9_eversource_345kv_structure_replacement_projects.pdf |2017, December presentation to PAC, replacement of 43 out of 166 poles.}} {{ ::a9_eversource_345kv_structure_replacement_projects.pdf |2017, December presentation to PAC, replacement of 43 out of 166 poles.}}
 +
 +{{ ::k165_p145_.pdf |2016, January 7: TCA approval, apparently reliability}}
 +
 +{{ :326:326_proposed_reliability_upgrade_10-2012.png?linkonly |2012, October, proposed reliability upgrade}}
  
 {{ :psnh_cost_per_mile_115kv.jpg?linkonly |}} {{ :psnh_cost_per_mile_115kv.jpg?linkonly |}}
  