Both sides previous revisionPrevious revisionNext revision | Previous revision |
379 [2023/09/27 08:18] – sigridundset | 379 [2024/04/06 09:15] (current) – sigridundset |
---|
379 345kV line | 379 345kV line |
| |
| {{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}} |
| |
{{ ::a05_es_381_379_optical_ground_wire_upgrade.pdf |2023, January 19, presentation to PAC, replace shield wire}} | {{ ::a05_es_381_379_optical_ground_wire_upgrade.pdf |2023, January 19, presentation to PAC, replace shield wire}} |
| |
{{ ::1-cre_2022-024-applicaton.pdf |}} | {{ ::4_cre-2022-024-license.pdf |2022, November 8: license for crossing}} |
| |
{{ ::1-cre-2022-013-petition.pdf |}} | {{ ::1-cre_2022-024-applicaton.pdf |2022, October 24: application for crossing}} |
| |
{{ ::2-cre-2022-013-petition-attachments.pdf |2022, March 16, water crossing diagrams also dated 12/2016. Required 20' clearance exceeded by 45'}} | {{ ::3-cre-2022-024-energy-staff-recommendation.pdf |2022, November 2: staff recommendation}} |
| |
{{ :379:379_-_n186_start_of_construction_form.pdf |}} | {{ ::2-cre-2022-024-_application-exhibits.pdf |2022, September 20: diagrams of crossing in Hinsdale, also dated 12/2016.}} |
| |
{{ :379:379_environmental_permitting_plan_set_5-5-2022.pdf |2022, May 5: permitting plan set}} | {{ ::379_-_n-186_des_permit_with_waivers.pdf |2022, July 8: DES permit with waivers of of Env-Wq 1503.12(d), Env-Wq 1503.21(d)(6) and (7), and Env-Wq 1504.09,}} |
| |
{{ ::4_cre-2022-024-license.pdf |2022, November 8: license for crossing}} | {{ ::1-cre-2022-013-petition.pdf |2022, July 8: petition for crossing}} |
| |
{{ ::3-cre-2022-024-energy-staff-recommendation.pdf |2022, November 2: staff recommendation}} | |
| |
{{ ::2-cre-2022-024-_application-exhibits.pdf |2022, September 20: diagrams of crossing in Hinsdale, also dated 12/2016.}} | |
| |
{{ :379:aot2189_rm.pdf |2022, July 8, DES Alteration of Terrain permit with waivers}} | {{ :379:379_-_n186_start_of_construction_form.pdf |2022, July 11: start of construction notification to DES}} |
| |
{{ ::4-cre-2022-013-license.pdf |2022, May 19: license for crossing}} | {{ ::4-cre-2022-013-license.pdf |2022, May 19: license for crossing}} |
| |
{{ ::22_04-18_eversource_391_373_line_2022_chester_cup_opt_v2.pdf |2022, April Chester Public Hearing Notice}} | {{ ::22_04-18_eversource_391_373_line_2022_chester_cup_opt_v2.pdf |2022, April Chester Public Hearing Notice}} |
| |
| {{ ::2-cre-2022-013-petition-attachments.pdf |2022, March 16, water crossing diagrams, also dated 12/2016. Required 20' clearance exceeded by 45'}} |
| |
{{ ::a9_eversource_345kv_structure_replacement_projects.pdf |2017, December presentation to PAC, replacement of 54 out of 169 poles.}} | {{ ::a9_eversource_345kv_structure_replacement_projects.pdf |2017, December presentation to PAC, replacement of 54 out of 169 poles.}} |
| |
| {{ :379:1997_k-165_379_opgw.pdf |1997, July 14: crossing of Merrimack River; ". The one location where the OPGW cable is to be installed will be on Line 379 crossing the Merrimack River in Litchfield and Merrimack.": }} |
| |
| |
| |