====== 380 ====== | ====== 380 ====== |
| |
| In easement with K-165 |
| |
{{::h123:h-123_k-165_and_380_merrimack_river_crossing.png?linkonly|2023 line map}} | {{::h123:h-123_k-165_and_380_merrimack_river_crossing.png?linkonly|2023 line map}} |
| |
| {{ :b112:raarp_forms_-_rtk_request_-_redacted_2_of_4.pdf |2023, July: Reptile and Amphibian sitings, including B-112 and 345kV line 385.}} |
| |
| {{ :380:380_-2024-003-license.pdf |2024, April 2: license}} |
| |
| {{ :380:380_2024-003-staff-recommendation.pdf |2024, March 25: staff recommendation}} |
| |
| {{ :380:380_2024-003-application.pdf |2024, March 19: application to cross state owned land in Londonderry}} |
| |
| {{ :380:380_2024-003-exhibits.pdf |2023, December 6: application exhibits}} |
| |
{{ ::a05_es_381_379_optical_ground_wire_upgrade.pdf |2023, January 19, presentation to PAC, ground wire replacement}} | {{ ::a05_es_381_379_optical_ground_wire_upgrade.pdf |2023, January 19, presentation to PAC, ground wire replacement}} |
| |
{{ ::3-cre-2022-025-energy-staff-recommendation.pdf |2022, November 4: staff recommendation}} | {{ ::3-cre-2022-025-energy-staff-recommendation.pdf |2022, November 4: staff recommendation}} |
| |
| {{ :b112:raarp_forms_-_rtk_request_-_redacted_3_of_4.pdf |2022, September: Reptile and Amphibian sitings including 345kV line 326, and line B-112, 2023}} |
| |
{{ ::1-cre-2022-025-application.pdf |2022, October 24; application for crossing}} | {{ ::1-cre-2022-025-application.pdf |2022, October 24; application for crossing}} |
| |
| {{ :380:raarp_forms_-_rtk_request_-_redacted_4_of_4.pdf |2022, August: Reptile and Amphibian sitings, including line 326}} |
| |
{{ :326:380_-_326_start_of_construction.pdf |2022, August 5: Start of construction notification}} | {{ :326:380_-_326_start_of_construction.pdf |2022, August 5: Start of construction notification}} |
{{ :380:380_2011-01-07_nhpuc_order_no_25-190_nisi_granting_license_.pdf |2011, January 7: Order Nisi}} | {{ :380:380_2011-01-07_nhpuc_order_no_25-190_nisi_granting_license_.pdf |2011, January 7: Order Nisi}} |
| |
{{ :380:380_2011-01-05_psnh_revised_exhibit_2_map.pdf |2011, January 5: revised exhibit 2; (3) 850.8 ASCR 45/6, 7#8 Alumoweld, (2) 24 fiber OPGW}} | {{ :380:380_2011-01-05_psnh_revised_exhibit_2_map.pdf |2011, January 5: revised exhibit 2; (3) 850.8 ASCR 45/6, (1) 7#8 Alumoweld, (1) 24 fiber OPGW}} |
| |
{{ :380:380_2011-01-05_staff_memo_recommendation.pdf |2011, January 5: staff recommendation}} | {{ :380:380_2011-01-05_staff_memo_recommendation.pdf |2011, January 5: staff recommendation}} |
| |
{{ :380:380_10-322_2010-12-03_psnh_petition_for_license_to_construct_lines_merrimack_river.pdf |2010, December 3: petition for crossing Merrimack River; "The 380 Line, as presently constructed, crosses the public waters of the Merrimack River in the Towns of Merrimack and Litchfield, New Hampshire. The existing overhead crossing of the 380 line (consisting of phase conductors, one static wire and one optical ground wire (OPGW)) was previously licensed by the Commission while designated as Line 379 running between PSNH’s Scobie Pond Substation and the Vermont Yankee substation in Vernon, Vermont. }} | {{ :380:380_10-322_2010-12-03_psnh_petition_for_license_to_construct_lines_merrimack_river.pdf |2010, December 3: petition for crossing Merrimack River; "The 380 Line, as presently constructed, crosses the public waters of the Merrimack River in the Towns of Merrimack and Litchfield, New Hampshire. The existing overhead crossing of the 380 line (consisting of phase conductors, one static wire and one optical ground wire (OPGW) was previously licensed by the Commission while designated as Line 379 running between PSNH’s Scobie Pond Substation and the Vermont Yankee substation in Vernon, Vermont. }} |
| |
| |