User Tools

Site Tools


asset_condition_lists

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
asset_condition_lists [2023/09/12 05:58] sigridundsetasset_condition_lists [2024/03/19 02:55] (current) sigridundset
Line 1: Line 1:
 Asset Condition lists Asset Condition lists
 +
 +{{ :ac:a04_2024_03_20_pac_draft_project_list_update_presentation.pdf |2024, March 20: RSP Project List and Asset Condition List}}
 +
 +{{ ::ac:2023_11_15_topac_eversource_lsp_listing.xlsx |2023, November 15: Eversource local system plan and asset condition listing}}
 +
 +{{ ::ac:2023_10_24_rsp_final_asset_condition_list.xlsx |2023, October 24: RSP final asset condition list}}
 +
 +{{ ::draft_assetcondition_list-oct2023.xlsx |2023, October, Draft}}
  
 {{ ::final_asset_condition_list_june_2023.xlsx |2023, June}} {{ ::final_asset_condition_list_june_2023.xlsx |2023, June}}
Line 56: Line 64:
  
 {{ ::a4_draft_rsp16_project_list_march_2016.xls |2016 March draft RSP project list xls}} {{ ::a4_draft_rsp16_project_list_march_2016.xls |2016 March draft RSP project list xls}}
 +
 +{{ :ac:a3_draft_rsp15_project_list_presentation.pdf |2015, October: RSP oroject list}}
  
 {{ ::a3_draft_rsp15_list_june_2015.xls |2015 June draft RSP list xls}} {{ ::a3_draft_rsp15_list_june_2015.xls |2015 June draft RSP list xls}}
Line 64: Line 74:
  
 {{ ::a3_draft_rsp15_project_list.xls |2015 RSP draft project list xls}} {{ ::a3_draft_rsp15_project_list.xls |2015 RSP draft project list xls}}
 +
 +{{ :ac:2014_rsp.pdf |2014 RSP overview: "Several developers have proposed Elective Transmission Upgrades, which are in various stages of study and development. These projects could increase New England’s tie capability with its neighbors and improve access to renewable sources of energy. For example, certain generators are considering elective upgrades as a way to mitigate the curtailment of wind energy resources. The ISO will continue to monitor the outcomes of these upgrades and their impacts on system conditions and needs. The ISO has initiated an effort to improve the existing process for reviewing ETUs"}}
  
 {{ ::a3_october_2014_rsp14_project_list.xls |2014 October RSP project list xls}} {{ ::a3_october_2014_rsp14_project_list.xls |2014 October RSP project list xls}}
asset_condition_lists.1694512714.txt.gz · Last modified: 2023/09/12 05:58 by sigridundset

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki