d-121 [2023/12/21 03:08] sigridundsetd-121 [2024/04/11 03:12] (current) sigridundset
Line 1: Line 1:
 D-121 115kV line D-121 115kV line
  
 +{{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}}
  
 +{{ :d121:d-121_2023-015-application.pdf |2023, June 14: structure structure will be replaced with a weathering steel equivalent, the existing three conductors, and two OPGW wires will be unchanged }}
 +
 +{{ :d121:d-121_2023-015-application-exhibits.pdf |2023, June 14:crossing exhibits; 795 ASCR 36/1 Coot, 48 fiber .646 AFL S3-81/69/646 OPGW}}
  
 {{ :d121:d121_aot_checklist.pdf |2023, June 14: AoT checklist}} {{ :d121:d121_aot_checklist.pdf |2023, June 14: AoT checklist}}
Line 11: Line 15:
  
 {{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18, presentation to PAC, replace 18 out of 154 structures; $5. million}} {{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18, presentation to PAC, replace 18 out of 154 structures; $5. million}}
- 
-{{ :may_18_2023_e_pac_lines_map.png?linkonly |2023, May 18: map showing line location}} 
  
 {{ :d121:aot2377_rm.pdf |2023, May 14: DES permit with waivers}} {{ :d121:aot2377_rm.pdf |2023, May 14: DES permit with waivers}}