k-165
K-165 115kV line
2023 line map
2022, May: Application for Special Exception Litchfield
petition
attachments
staff recommendation
license
order of notice
2022 order
2017, July 10: Hudson Conservation Commission minutes
2016, January 7: TCA approval, apparently reliability
2012, March 8: Order Nisi
2012, March 6: staff recommendation; to alter an existing crossing of the Merrimack River in Merrimack and Litchfield, New Hampshire by altering the material, height, location of both support structures as well as increasing the conductor size and
material, increasing the size and material of the static wire which serves as a shield wire and replacing the communication wire from an ADSS type to an OPGW line (84 fiber optic cable). The relocation of the existing support structures of an existing 115 kv transmission line (Circuit K- 165 referred to as
the “Busch Tap”) on both sides of the Merrimack River allows for proper clearance from a newly proposed circuit H- 123 (115 kV) that will be installed between Line 380 (345kV) and the relocated K-165 (115 kV)
2012, October: proposed reliability rebuild
2011, November 30: petition for crossing Merrimack River
2011, November 30: structure diagrams
2011, November 30: crossing exhibits
1997, July 14: Three crossings of the Merrimack River will use under built, all dielectric, self supporting fiber optic cable, known as ADSS cable: Bridge Street Tap, Busch Tap and Reeds Ferry to Hudson
1996,December 11: licensing of one ADSS
k-165.txt · Last modified: 2024/04/28 04:54 by sigridundset