E-115 115kV Line $64 million | E-115 115kV Line $64 million |
| |
| {{ ::2023_11_15_topac_lsp_eversource_presentation.pdf |2023, November 15: Eversource TOPAC (Transmission Owners Planning Advisory Committee presentation to PAC}} |
| |
{{ ::e-115_z-1180_and_a-111_2023.pdf |2023, March 14: NEPOOL approval of $100 m.+ for A-11, E-115 and Z-180 for Transmission Cost Allowance}} | {{ ::e-115_z-1180_and_a-111_2023.pdf |2023, March 14: NEPOOL recommends ISO approval of $100 m.+ for A-11, E-115 and Z-180 for Transmission Cost Allowance}} |
| |
{{ ::e-115_z-1180_and_a-111_2023.pdf |2023, March: request to NEPOOL for TCA}} | {{ ::e-115_z-1180_and_a-111_2023.pdf |2023, March: request to NEPOOL for TCA}} |
{{ ::attachment_rr-dpu-es-3.pdf |2022, October 19; PAC presentation }} | {{ ::attachment_rr-dpu-es-3.pdf |2022, October 19; PAC presentation }} |
| |
{{ ::a05_1_es-22-tca-20_final.pdf |2022, June 27: Final TCA E-115}} | {{ :a05_1_es-22-tca-20_final.pdf |2022, June 27: Eversource Transmission Cost Allocation application}} |
| |
{{ :e115:e115_aot_amended_plan_6-24-2022.pdf |2022, June 24: AoT amended}} | {{ ::22-049_2022-08-24_eversource_att-pet-approval-financing-transaction.pdf |2022, June 30: complete DE-22-049 document listing E$ proposed spending}} |
| |
{{ ::e115-start-of-construction-letter.pdf |2022, June 23; start of construction letter}} | {{ :e115:e115_aot_amended_plan_6-24-2022.pdf |2022, June 24: AoT permit plans amended}} |
| |
{{ :e115:aot-2140a_planse115.pdf |2022, June 4, Alteration of Terrain plans amendment}} | {{ ::road_construction_on_the_e-115_line.pdf |road construction on the E-115 before replacement with new larger line with taller and wider steel towers and larger conductor}} |
| |
| {{ ::22-049_2022-08-24_eversource_att-pet-approval-financing-transaction.pdf |2022, June 30: complete DE-22-049 document listing E$ proposed spending}} |
| |
| {{ ::e115-start-of-construction-letter.pdf |2022, June 23; start of construction letter}} |
| |
{{ ::e115-project-maps.pdf |2022, May 12: Access and permitting plans}} | {{ ::e115-project-maps.pdf |2022, May 12: Access and permitting plans}} |
| |
{{ :e115:e115_start_of_construction.pdf |2022, April 22: Start of Construction }} | {{ :e115:e115_start_of_construction.pdf |2022, April 22: Start of Construction }} |
| |
{{ ::e115:aot_e115_stamped.pdf |2022, March 22: Alteration of terrain plans first page stamped}} | |
| |
{{ ::road_construction_on_the_e-115_line.pdf |road construction on the E-115 before replacement with new larger line with taller and wider steel towers and larger conductor}} | |
| |
{{ ::03-29-22_mtg_minutes_prlac.pdf |2022, March 23; PRLAC (Pemigewasset River Local Advisory Committee) Minutes. Eversource later said no permits were required.}} | {{ ::03-29-22_mtg_minutes_prlac.pdf |2022, March 23; PRLAC (Pemigewasset River Local Advisory Committee) Minutes. Eversource later said no permits were required.}} |
| |
{{ :e115:e15_cover_page_stamped.pdf |2022, March 1 AoT first page stamped}} | {{ :e115:e15_cover_page_stamped.pdf |2022, March 1 AoT first page stamped}} |
| |
| {{ :e115:e115_aot_application_3-2022.pdf |2022, March: AoT application}} |
| |
{{ :e115:e115_ground_and_surface_water_overlay_map_2-21-2022.pdf |2022, February 21: Surface and Groundwater overlay maps, GZA}} | {{ :e115:e115_ground_and_surface_water_overlay_map_2-21-2022.pdf |2022, February 21: Surface and Groundwater overlay maps, GZA}} |
| |
{{ ::license-granted.pdf |2022, January: license granted}} | {{ :iso_7-15-2021_no_significant_impact_of_interconnection.pdf |2021, July 15: no impact from interconnection}} |
| |
{{ ::staff-recommendation.pdf |2022, January: staff recommendation}} | {{ :a111:a-111_1537_2021-0906.pdf |2021, March 9: inspection permit DES}} |
| |
{{ :a05_1_es-22-tca-20_final.pdf |2022: Eversource Transmission Cost Allocation application}} | {{ ::license-granted.pdf |2022, January 31: license granted}} |
| |
{{ ::cr-2021-025-order-of-notice.pdf |2021: order of notice}} | {{ ::cr-2021-025-order-of-notice.pdf |2021, January 14: order of notice}} |
| |
{{ ::petition-attachments.pdf |December 2021, petition attachment, 12/2016 original date, pole heights 52'-106'}} | {{ ::staff-recommendation.pdf |2022, January 10: staff recommendation}} |
| |
{{ :iso_7-15-2021_no_significant_impact_of_interconnection.pdf |2021, July: no impact from interconnection}} | {{ ::petition-attachments.pdf |December 2021, petition attachments, 12/2016 original date, pole heights 52'-106'}} |
| |
{{ ::e1115crossing.pdf |crossing}} | {{ ::e1115crossing.pdf |2021, December 21: E$ petition for crossing}} |
| |
| {{ :2017_river_crossings_existing_poles_and_wires_just_fine.pdf |2017 river crossing rights exhibits}} |
| |
{{ :a5_webster_beebe_river_115kv_corridor_asset conditions_and_opgw_project_lines_a111_e115_z180_rev1_clean.pdf |2020, December 16: presentation to PAC}} | {{ ::pre-np_multi_line_assertion_of_rights_2017-12-14_eversource_petition_water_crossing.pdf |2017, December 14: assertion of 2015 assertion of crossing rights}} |
| |
{{ ::2017_river_crossings_existing_poles_and_wires_just_fine.pdf |2017 river crossings, no mention of pole degradation}} | |
| |
{{ ::e-115_and_a-111_2-15.png?linkonly |2015: "The load and added local generation in this area has not required the upgrading of either line."}} | {{ ::e-115_and_a-111_2-15.png?linkonly |2015: "The load and added local generation in this area has not required the upgrading of either line."}} |
| |
| {{ :e115:e-115_planned_upgrade_reliability_10-2012.png?linkonly |2012, October: Proposed reliability upgrade}} |
| |
| |