 E-115 115kV Line $64 million E-115 115kV Line $64 million
  
 +{{ ::2023_11_15_topac_lsp_eversource_presentation.pdf |2023, November 15: Eversource TOPAC (Transmission Owners Planning Advisory Committee presentation to PAC}}
  
-{{ ::e-115_z-1180_and_a-111_2023.pdf |2023, March 14: NEPOOL approval of $100 m.+ for A-11, E-115 and Z-180 for Transmission Cost Allowance}}+{{ ::e-115_z-1180_and_a-111_2023.pdf |2023, March 14: NEPOOL recommends ISO approval of $100 m.+ for A-11, E-115 and Z-180 for Transmission Cost Allowance}}
  
 {{ ::e-115_z-1180_and_a-111_2023.pdf |2023, March: request to NEPOOL for TCA}} {{ ::e-115_z-1180_and_a-111_2023.pdf |2023, March: request to NEPOOL for TCA}}
Line 24: Line 25:
 {{ ::attachment_rr-dpu-es-3.pdf |2022, October 19; PAC presentation }} {{ ::attachment_rr-dpu-es-3.pdf |2022, October 19; PAC presentation }}
  
-{{ ::a05_1_es-22-tca-20_final.pdf |2022, June 27: Final TCA E-115}}+{{ :a05_1_es-22-tca-20_final.pdf |2022, June 27: Eversource Transmission Cost Allocation application}}
  
-{{ :e115:e115_aot_amended_plan_6-24-2022.pdf |2022, June 24AoT amended}}+{{ ::22-049_2022-08-24_eversource_att-pet-approval-financing-transaction.pdf |2022, June 30complete DE-22-049 document listing E$ proposed spending}}
  
-{{ ::e115-start-of-construction-letter.pdf |2022, June 23; start of construction letter}}+{{ :e115:e115_aot_amended_plan_6-24-2022.pdf |2022, June 24: AoT permit plans amended}}
  
-{{ :e115:aot-2140a_planse115.pdf |2022, June 4Alteration of Terrain plans amendment}}+{{ ::road_construction_on_the_e-115_line.pdf |road construction on the E-115 before replacement with new larger line with taller and wider steel towers and larger conductor}} 
 + 
 +{{ ::22-049_2022-08-24_eversource_att-pet-approval-financing-transaction.pdf |2022, June 30: complete DE-22-049 document listing E$ proposed spending}} 
 + 
 +{{ ::e115-start-of-construction-letter.pdf |2022June 23; start of construction letter}}
  
 {{ ::e115-project-maps.pdf |2022, May 12: Access and permitting plans}} {{ ::e115-project-maps.pdf |2022, May 12: Access and permitting plans}}
Line 37: Line 42:
  
 {{ :e115:e115_start_of_construction.pdf |2022, April 22: Start of Construction }} {{ :e115:e115_start_of_construction.pdf |2022, April 22: Start of Construction }}
- 
-{{ ::e115:aot_e115_stamped.pdf |2022, March 22: Alteration of terrain plans first page stamped}} 
- 
-{{ ::road_construction_on_the_e-115_line.pdf |road construction on the E-115 before replacement with new larger line with taller and wider steel towers and larger conductor}} 
  
 {{ ::03-29-22_mtg_minutes_prlac.pdf |2022, March 23; PRLAC (Pemigewasset River Local Advisory Committee) Minutes. Eversource later said no permits were required.}} {{ ::03-29-22_mtg_minutes_prlac.pdf |2022, March 23; PRLAC (Pemigewasset River Local Advisory Committee) Minutes. Eversource later said no permits were required.}}
  
 {{ :e115:e15_cover_page_stamped.pdf |2022, March 1 AoT first page stamped}} {{ :e115:e15_cover_page_stamped.pdf |2022, March 1 AoT first page stamped}}
 +
 +{{ :e115:e115_aot_application_3-2022.pdf |2022, March: AoT application}}
  
 {{ :e115:e115_ground_and_surface_water_overlay_map_2-21-2022.pdf |2022, February 21: Surface and Groundwater overlay maps, GZA}} {{ :e115:e115_ground_and_surface_water_overlay_map_2-21-2022.pdf |2022, February 21: Surface and Groundwater overlay maps, GZA}}
  
-{{ ::license-granted.pdf |2022January 31license granted}}+{{ :iso_7-15-2021_no_significant_impact_of_interconnection.pdf |2021July 15no impact from interconnection}}
  
-{{ ::staff-recommendation.pdf |2022January 10staff recommendation}}+{{ :a111:a-111_1537_2021-0906.pdf |2021March 9inspection permit DES}}
  
-{{ :a05_1_es-22-tca-20_final.pdf |2022: Eversource Transmission Cost Allocation application}}+{{ ::license-granted.pdf |2022, January 31license granted}}
  
-{{ ::cr-2021-025-order-of-notice.pdf |2021: order of notice}}+{{ ::cr-2021-025-order-of-notice.pdf |2021, January 14: order of notice}}
  
-{{ ::petition-attachments.pdf |December 2021petition attachment, 12/2016 original date, pole heights 52'-106'}}+{{ ::staff-recommendation.pdf |2022January 10: staff recommendation}}
  
-{{ :iso_7-15-2021_no_significant_impact_of_interconnection.pdf |2021, July 15: no impact from interconnection}}+{{ ::petition-attachments.pdf |December 2021, petition attachments, 12/2016 original date, pole heights 52'-106'}}
  
-{{ ::e1115crossing.pdf |crossing}}+{{ ::e1115crossing.pdf |2021, December 21: E$ petition for crossing}} 
 +  
 +{{ :2017_river_crossings_existing_poles_and_wires_just_fine.pdf |2017 river crossing rights exhibits}}
  
-{{ ::2017_river_crossings_existing_poles_and_wires_just_fine.pdf |2017 river crossingsno mention of pole degradation}}+{{ ::pre-np_multi_line_assertion_of_rights_2017-12-14_eversource_petition_water_crossing.pdf |2017, December 14: assertion of 2015 assertion of crossing rights}}
  
 {{ ::e-115_and_a-111_2-15.png?linkonly |2015: "The load and added local generation in this area has not required the upgrading of either line."}} {{ ::e-115_and_a-111_2-15.png?linkonly |2015: "The load and added local generation in this area has not required the upgrading of either line."}}
 +
 +{{ :e115:e-115_planned_upgrade_reliability_10-2012.png?linkonly |2012, October: Proposed reliability upgrade}}
  
  