User Tools

Site Tools


e-115

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
e-115 [2024/07/16 04:06] sigridundsete-115 [2024/07/18 04:33] (current) sigridundset
Line 2: Line 2:
  
 {{ ::2023_11_15_topac_lsp_eversource_presentation.pdf |2023, November 15: Eversource TOPAC (Transmission Owners Planning Advisory Committee presentation to PAC}} {{ ::2023_11_15_topac_lsp_eversource_presentation.pdf |2023, November 15: Eversource TOPAC (Transmission Owners Planning Advisory Committee presentation to PAC}}
- 
-{{ :a111:es_webster_beebe_river_tca_determination.pdf |2023, May 31: ISO approval of Transmission Cost Allocation}} 
  
 {{ ::e-115_z-1180_and_a-111_2023.pdf |2023, March 14: NEPOOL recommends ISO approval of $100 m.+ for A-11, E-115 and Z-180 for Transmission Cost Allowance}} {{ ::e-115_z-1180_and_a-111_2023.pdf |2023, March 14: NEPOOL recommends ISO approval of $100 m.+ for A-11, E-115 and Z-180 for Transmission Cost Allowance}}
Line 44: Line 42:
  
 {{ :e115:e115_start_of_construction.pdf |2022, April 22: Start of Construction }} {{ :e115:e115_start_of_construction.pdf |2022, April 22: Start of Construction }}
- 
-{{ ::e115:aot_e115_stamped.pdf |2022, March 22: Alteration of terrain plans first page stamped}} 
  
 {{ ::03-29-22_mtg_minutes_prlac.pdf |2022, March 23; PRLAC (Pemigewasset River Local Advisory Committee) Minutes. Eversource later said no permits were required.}} {{ ::03-29-22_mtg_minutes_prlac.pdf |2022, March 23; PRLAC (Pemigewasset River Local Advisory Committee) Minutes. Eversource later said no permits were required.}}
  
 {{ :e115:e15_cover_page_stamped.pdf |2022, March 1 AoT first page stamped}} {{ :e115:e15_cover_page_stamped.pdf |2022, March 1 AoT first page stamped}}
 +
 +{{ :e115:e115_aot_application_3-2022.pdf |2022, March: AoT application}}
  
 {{ :e115:e115_ground_and_surface_water_overlay_map_2-21-2022.pdf |2022, February 21: Surface and Groundwater overlay maps, GZA}} {{ :e115:e115_ground_and_surface_water_overlay_map_2-21-2022.pdf |2022, February 21: Surface and Groundwater overlay maps, GZA}}
e-115.1721117211.txt.gz · Last modified: 2024/07/16 04:06 by sigridundset

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki