User Tools

Site Tools


f-190

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
f-190 [2023/11/12 06:22] – created sigridundsetf-190 [2024/11/22 08:03] (current) sigridundset
Line 1: Line 1:
 ====== F-190 ====== ====== F-190 ======
  
 +
 +{{ ::eversource_2024_lsp_a.pdf |2024, November 20: Local System Plan}}
  
 {{ ::2023_11_15_topac_lsp_eversource_presentation.pdf |2023, November 15: Eversource TOPAC (Transmission Owners Planning Advisory Committee presentation to PAC}} {{ ::2023_11_15_topac_lsp_eversource_presentation.pdf |2023, November 15: Eversource TOPAC (Transmission Owners Planning Advisory Committee presentation to PAC}}
 +
 +{{ :b112:d.p.u._18-64-65-66_-_notice_of_tsa_third_amendments.pdf |2021, November 17: TSA requirements for connecting to Maine HVDC project "b. Public Service Company of New Hampshire (d/b/a Eversource Energy), as an Affected Party as defined in the ISO-NE Tariff, is responsible to upgrade both segments of 115 kV
 +B112 Line (Beebe River – F190 Tap – White Lake) to increase the summer LTE rating to
 +at least 147 MVA.'}}
f-190.1699788161.txt.gz · Last modified: 2023/11/12 06:22 by sigridundset

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki