-====== ====== H-141 115kV line ====== ======+====== H-141 115kV line ====== 
  
 The H-141 line runs for 19.2 miles through Sandown, Danville, Fremont, Exeter, Stratham and North Hampton. Conductor is 336 ASCR 26/7 (19 m), 1272 ASCR (.1 m), 1590 ACSS (.2 m).  The H-141 line runs for 19.2 miles through Sandown, Danville, Fremont, Exeter, Stratham and North Hampton. Conductor is 336 ASCR 26/7 (19 m), 1272 ASCR (.1 m), 1590 ACSS (.2 m). 
Line 45: Line 45:
 {{ ::3-cre-2023-008-energy-staff-recommendation.pdf |2023 April 20: staff recommendation}} {{ ::3-cre-2023-008-energy-staff-recommendation.pdf |2023 April 20: staff recommendation}}
  
-{{ ::1-cre-2023-008-crossing_application.pdf |2023; April 19: crossing application; " The +{{ ::1-cre-2023-008-crossing_application.pdf |2023; April 19: crossing application}}
-H141’s existing three conductors, one static wires, and one optical ground wire (OPGW), whose +
-specifications are identified on Exhibit 2, 5 and 6, will be unchanged in the course of performing +
-the structure replacements."}}+
  
 {{ ::h141_-_r193_aot.pdf |2023, April 6: AoT application, GZA}} {{ ::h141_-_r193_aot.pdf |2023, April 6: AoT application, GZA}}
Line 56: Line 53:
 {{ ::h141_r193_aot_wetlands_damages_4-2023.pdf |2023 April: AoT permitting plans}} {{ ::h141_r193_aot_wetlands_damages_4-2023.pdf |2023 April: AoT permitting plans}}
  
-{{ :h141:h-141_2023-008-application-exhibits.pdf |2023, March 6: crossing application exhibits}} +{{ ::2-cre-2023-008-exhibits_1_to_6.pdf |2023; March 6: crossing exhibits; state lands Exeter and Brentwood, Exeter River in Fremont}}
- +
-{{ ::2-cre-2023-008-exhibits_1_to_6.pdf |2023; March 6: crossing exhibits}}+
  
 {{ :a126:a126_-_h141_-_s153_aot_.pdf |2023, March 21: Alteration of Terrain application. "New steel poles will be installed. Existing conductors and static wire will be transferred to new steel poles."}} {{ :a126:a126_-_h141_-_s153_aot_.pdf |2023, March 21: Alteration of Terrain application. "New steel poles will be installed. Existing conductors and static wire will be transferred to new steel poles."}}
  
-{{ ::22-049_2022-08-24_eversource_att-pet-approval-financing-transaction.pdf |2022, June 30: complete DE-22-049 document listing E$ proposed spending}}+{{ ::22-049_2022-08-24_eversource_att-pet-approval-financing-transaction.pdf |2022, June 30: complete DE-22-049 document listing E$ proposed spending; $657,000.}}
  
-{{ ::cr-2021-011-eversource-crossing-order-of-notice.pdf |2021; October 19: crossing order of notice}}+{{ ::cr-2021-011-eversource-crossing-order-of-notice.pdf |2021; October 19: crossing order of notice; replace structures 175-177, 182-184 and 186-188, State land in Brentwood}}
  
 {{ ::october_7_2021.pdf |2021; October 7: Brentwood planning board minutes}} {{ ::october_7_2021.pdf |2021; October 7: Brentwood planning board minutes}}
Line 70: Line 65:
 {{ ::recommendation.pdf |2021; September 10: staff recommendation}} {{ ::recommendation.pdf |2021; September 10: staff recommendation}}
  
-{{ :h141:h-141_2021-09-07_nhpuc_letter-transfer-nhdoe.pdf |2021,, September 7: transfer from PUC to DOE}}+{{ :h141:h-141_2021-09-07_nhpuc_letter-transfer-nhdoe.pdf |2021, September 7: transfer from PUC to DOE}}
  
-{{ :h141:h-141_2021-06-17_eversource_petition_crossing.pdf |2021, June 17: crossing petition}}+{{ :h141:h-141_2021-06-17_eversource_petition_crossing.pdf |2021, June 17: crossing petition; "As part of its ongoing asset condition inspection program, Eversource determined that original wood structures 175 through 177 and 182, 183, 184, 1 186, 187 & 188 need to be replaced to continue to function safely and reliably"}}
  
 {{ :h141:h-141_2021-06-17_eversource_att_petition_crossing.pdf |2021, June 17: crossing exhibits}} {{ :h141:h-141_2021-06-17_eversource_att_petition_crossing.pdf |2021, June 17: crossing exhibits}}
- 
-{{ ::petition_h-141.pdf |2021 June 17: E$ crossing petition, state owned lands Brentwod and Exeter, replace 9 structures}} 
- 
-{{ ::petition-att.pdf |2021; May 7: E$ crossing exhibits State owned land Brentwood and Exeter}} 
  
 {{ ::eversource_permit-by-notification-030921.pdf |2021; March 19: ES permit by notification}} {{ ::eversource_permit-by-notification-030921.pdf |2021; March 19: ES permit by notification}}
Line 84: Line 75:
 {{ :h141:h-141_2020-04-01_order_26345_summary.pdf |2020, April 1: order summary}} {{ :h141:h-141_2020-04-01_order_26345_summary.pdf |2020, April 1: order summary}}
  
-{{ :h141:h-141_2020-04-01_order_26345.pdf |2020, April 1: order}}+{{ :h141:h-141_2020-04-01_order_26345.pdf |2020, April 1: order Nisi; The proposed modification to the water crossing begins at Structure 137 on the east side of the Squamscott River in Stratham and continues in a northwesterly direction to Structure 138 in Exeter. The crossing over state-owned land in Sandown begins at Structure 270 and continues in a westerly direction to Structure 271}}
  
 {{ :h141:h-141_2020-03-10_order_26338_summary.pdf |2020, March 10: order summary}} {{ :h141:h-141_2020-03-10_order_26338_summary.pdf |2020, March 10: order summary}}
  
-{{ :h141:h-141_2020-03-10_order_26338.pdf |2020, March 10: order}}+{{ :h141:h-141_2020-03-10_order_26338.pdf |2020, March 10: order Nisi; "Eversource seeks modification of its Hl41 Line, an existing overhead 115 kV electric transmission line over the Squamscott River between Stratham and Exeter, and across state-owned land in Sandown. Specifically, Eversource will replace four wooden pole structures with steel structures on portions of the H 141 Line that run over and across the Squamscott River and the state-owned land parcel."}}
  
 {{ :h141:h-141_2020-02-26_revised_staff_rec.pdf |2020, February 26: revised staff recommendation}} {{ :h141:h-141_2020-02-26_revised_staff_rec.pdf |2020, February 26: revised staff recommendation}}
  
 {{ :h141:h-141_2019-11-12_staff_recommendation.pdf |2019, November 12: staff recommendations}} {{ :h141:h-141_2019-11-12_staff_recommendation.pdf |2019, November 12: staff recommendations}}
- 
-{{ :h141:h-141_2019-07-09_order_26270.pdf |2019, July 9: order}} 
  
 {{ :h141:h-141_2019_.pdf |2019, July 16: order granting crossing of Exeter River:}} {{ :h141:h-141_2019_.pdf |2019, July 16: order granting crossing of Exeter River:}}
 +
 +{{ :h141:h-141_2019-07-09_order_26270.pdf |2019, July 9: order; "Eversource filed the original petition and attachments in this matter on January 7, 2019. The Company filed revisions on May 10, 2019. Through the revised petition and attachments, Eversource requested two licenses pursuant to RSA 371:17 to construct and maintain electric transmission lines over Dudley Brook...The proposed modifications to the H141 Line begin at Structure #197 on the east side of Dudley Brook and will continue in a westerly direction to Structure #198...the total span from Structure #197 to Structure #198, after relocation, will be approximately 602 feet. Structures #198 and #222 are also changing in height from 70 to 75 feet above ground. The existing wooden structures will be replaced with new steel monopole structures and both transmission lines will be reconstructed using the existing conductors.}}
  
 {{ :h141:h-141_2019-07-09_order_26270_summary.pdf |2019, July 9: order summary}} {{ :h141:h-141_2019-07-09_order_26270_summary.pdf |2019, July 9: order summary}}
Line 108: Line 99:
 {{ :h141:h-141_2019-05-17_staff_recommendation.pdf |2019, May 17: staff recommendations}} {{ :h141:h-141_2019-05-17_staff_recommendation.pdf |2019, May 17: staff recommendations}}
  
-{{ :h141:h-141_2019-05-13_eversource_petition_cross_land_water_stratham_exeter_sandown.pdf |2019, May 13: crossing petition Swamscott River and State Lands}}+{{ :h141:h-141_2019-05-13_eversource_petition_cross_land_water_stratham_exeter_sandown.pdf |2019, May 13: crossing petition Swamscott River and Rockingham Rail Trail}}
  
-{{ :h141:h-141_2019-05-13_eversource_att_petition_cross_land_water_stratham_exeter_sandown.pdf |2019, May 13crossing exhibits, Swamscott River and State Lands}}+{{ :h141:h-141_2019-05-10_eversource_revisions_petition.pdf |2019, May 10petition revisions}}
  
-{{ :h141:h-141_2019-05-10_eversource_att_revisions_petition.pdf |2019, May 10: crossing petition, revisions}} +{{ :h141:h-141_2019-05-10_eversource_att_revisions_petition.pdf |2019, May 10: crossing petition exhibit, revisions}}
- +
-{{ :h141:h-141_2019-05-10_eversource_revisions_petition.pdf |2019, May 10: petition revisions}}+
  
 {{ :h141:h-141_2019-04-22_staff_rec.pdf |2019, April 22: staff recommendation}} {{ :h141:h-141_2019-04-22_staff_rec.pdf |2019, April 22: staff recommendation}}