Both sides previous revisionPrevious revisionNext revision | Previous revision |
h-141 [2024/04/17 02:49] – sigridundset | h-141 [2024/04/17 03:13] (current) – sigridundset |
---|
====== ====== H-141 115kV line ====== ====== | ====== H-141 115kV line ====== |
| |
The H-141 line runs for 19.2 miles through Sandown, Danville, Fremont, Exeter, Stratham and North Hampton. Conductor is 336 ASCR 26/7 (19 m), 1272 ASCR (.1 m), 1590 ACSS (.2 m). | The H-141 line runs for 19.2 miles through Sandown, Danville, Fremont, Exeter, Stratham and North Hampton. Conductor is 336 ASCR 26/7 (19 m), 1272 ASCR (.1 m), 1590 ACSS (.2 m). |
| |
{{ :h141:h-141_2019-11-12_staff_recommendation.pdf |2019, November 12: staff recommendations}} | {{ :h141:h-141_2019-11-12_staff_recommendation.pdf |2019, November 12: staff recommendations}} |
| |
{{ :h141:h-141_2019-07-09_order_26270.pdf |2019, July 9: order}} | |
| |
{{ :h141:h-141_2019_.pdf |2019, July 16: order granting crossing of Exeter River:}} | {{ :h141:h-141_2019_.pdf |2019, July 16: order granting crossing of Exeter River:}} |
| |
| {{ :h141:h-141_2019-07-09_order_26270.pdf |2019, July 9: order; "Eversource filed the original petition and attachments in this matter on January 7, 2019. The Company filed revisions on May 10, 2019. Through the revised petition and attachments, Eversource requested two licenses pursuant to RSA 371:17 to construct and maintain electric transmission lines over Dudley Brook...The proposed modifications to the H141 Line begin at Structure #197 on the east side of Dudley Brook and will continue in a westerly direction to Structure #198...the total span from Structure #197 to Structure #198, after relocation, will be approximately 602 feet. Structures #198 and #222 are also changing in height from 70 to 75 feet above ground. The existing wooden structures will be replaced with new steel monopole structures and both transmission lines will be reconstructed using the existing conductors.}} |
| |
{{ :h141:h-141_2019-07-09_order_26270_summary.pdf |2019, July 9: order summary}} | {{ :h141:h-141_2019-07-09_order_26270_summary.pdf |2019, July 9: order summary}} |
{{ :h141:h-141_2019-05-17_staff_recommendation.pdf |2019, May 17: staff recommendations}} | {{ :h141:h-141_2019-05-17_staff_recommendation.pdf |2019, May 17: staff recommendations}} |
| |
{{ :h141:h-141_2019-05-13_eversource_petition_cross_land_water_stratham_exeter_sandown.pdf |2019, May 13: crossing petition Swamscott River and State Lands}} | {{ :h141:h-141_2019-05-13_eversource_petition_cross_land_water_stratham_exeter_sandown.pdf |2019, May 13: crossing petition Swamscott River and Rockingham Rail Trail}} |
| |
{{ :h141:h-141_2019-05-13_eversource_att_petition_cross_land_water_stratham_exeter_sandown.pdf |2019, May 13: crossing exhibits, Swamscott River and State Lands}} | {{ :h141:h-141_2019-05-10_eversource_revisions_petition.pdf |2019, May 10: petition revisions}} |
| |
{{ :h141:h-141_2019-05-10_eversource_att_revisions_petition.pdf |2019, May 10: crossing petition, revisions}} | {{ :h141:h-141_2019-05-10_eversource_att_revisions_petition.pdf |2019, May 10: crossing petition exhibit, revisions}} |
| |
{{ :h141:h-141_2019-05-10_eversource_revisions_petition.pdf |2019, May 10: petition revisions}} | |
| |
{{ :h141:h-141_2019-04-22_staff_rec.pdf |2019, April 22: staff recommendation}} | {{ :h141:h-141_2019-04-22_staff_rec.pdf |2019, April 22: staff recommendation}} |