User Tools

Site Tools


l-163

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
l-163 [2024/04/24 02:22] sigridundsetl-163 [2024/07/23 04:14] (current) sigridundset
Line 5: Line 5:
 {{ ::de-20-211.pdf |2021, May 18: crossing permit for North Branch River and an unnamed outflow stream of Island Pond in Stoddard, Otter Brook in Sullivan, the Ashuelot River in Keene, and public land owned by the State of New Hampshire in Stoddard}} {{ ::de-20-211.pdf |2021, May 18: crossing permit for North Branch River and an unnamed outflow stream of Island Pond in Stoddard, Otter Brook in Sullivan, the Ashuelot River in Keene, and public land owned by the State of New Hampshire in Stoddard}}
  
-{{ ::a5_eversource_copper_conductor_and_shield_wire_replacement_project.pdf |2021, January 21 PAC presentation, replace 62 structures at $22.3 m.(estimated)}}+{{ :l163:l-163_and_d-108_keene_2021_03_22_pb_minutes_adopted.pdf |2021, March 22: Keene Planning Board  
 +minutes}}
  
-{{ ::l163_0_x104_des_permit_with_waivers.pdf |2020April 9, DES permit with waivers}}+{{ :c129:373_012121_pac_minutes_final.pdf |2021January 21: Minutes from PAC meeting.}}
  
-{{ ::l163_aot_4-6-2020.pdf |2020, April 6: Alteration of Terrain plans}} +{{ ::a5_eversource_copper_conductor_and_shield_wire_replacement_project.pdf |2021, January 21 PAC presentationreplace 62 structures at $22.3 m.(estimated)}}
- +
-{{ ::l163_4-3-2020_cover_page.pdf |2020, April 3, AoT cover page}} +
- +
-{{ ::l163_emails_des_re_protected_species.pdf |2020, April 2: emails re protected species}} +
- +
-{{ ::l163_aot_application.pdf |2020, January 30: Alteration of Terrain application}} +
- +
-{{ ::l163_surface_and_groundwater_overlay_aot_1-12-2020.pdf |2020January 12: Alteration of Terrain surface and groundwater overlay.}} +
- +
-{{ :l163:l-163_and_d-108_keene_2021_03_22_pb_minutes_adopted.pdf |2021, March 22: Keene Planning Board minutes}}+
  
 {{ :l163:l-163_2020-12-30_eversource_petition_crossing.pdf |2020, December 30: petition to cross  the North Branch River and an unnamed outflow stream of Island Pond in Stoddard, Otter Brook in Sullivan, the Ashuelot River in Keene, and public land owned by the State of New Hampshire in Stoddard.}} {{ :l163:l-163_2020-12-30_eversource_petition_crossing.pdf |2020, December 30: petition to cross  the North Branch River and an unnamed outflow stream of Island Pond in Stoddard, Otter Brook in Sullivan, the Ashuelot River in Keene, and public land owned by the State of New Hampshire in Stoddard.}}
Line 33: Line 24:
 {{ :l163:l-163_2020-04-16_staff_rec.pdf |2020, April 16: staff recommendation}} {{ :l163:l-163_2020-04-16_staff_rec.pdf |2020, April 16: staff recommendation}}
  
-{{ :l163:l-162_2019-10-15_eversource_petition_crossing_keene_stoddard_sullivan.pdf |2019October 15: petition for crossing, KeeneStoddard and Sullivan}}+{{ ::l163_0_x104_des_permit_with_waivers.pdf |2020April 9DES permit with waivers}}
  
-{{ :l163:l-163_2019-10-15_eversource_att_petition_crossing_keene_stoddard_sullivan.pdf |2019October 15petition exhibits}}+{{ ::l163_aot_4-6-2020.pdf |2020April 6Alteration of Terrain plans}}
  
-{{ ::l-163_2019_linnet_stays_crossing_keene_stoddard_sullivan.pdf |2019; crossing exhibits; conductor not replacedstays at 336}}+{{ ::l163_4-3-2020_cover_page.pdf |2020, April 3AoT cover page}}
  
 +{{ ::l163_emails_des_re_protected_species.pdf |2020, April 2: emails re protected species}}
  
-{{ :l163:l-163_keene_cc_2020_01_27_pb_agenda_packet.pdf |2020, January 27: Planning Board Agenda}}+{{ ::l163_aot_application.pdf |2020, January 30: Alteration of Terrain application}} 
 + 
 +{{ :l163:l-163_keene_cc_2020_01_27_pb_agenda_packet.pdf |2020, January 27: Keene Planning Board Agenda}} 
 + 
 +{{ ::l163_surface_and_groundwater_overlay_aot_1-12-2020.pdf |2020, January 12: Alteration of Terrain surface and groundwater overlay.}}
  
 {{ ::l163:l-163_10-30-2019_antrim_cc_.pdf |2019, October 30: Antrim Conservation Commission minutes}} {{ ::l163:l-163_10-30-2019_antrim_cc_.pdf |2019, October 30: Antrim Conservation Commission minutes}}
  
 +{{ :l163:l-162_2019-10-15_eversource_petition_crossing_keene_stoddard_sullivan.pdf |2019, October 15: petition for crossing, Keene, Stoddard and Sullivan}}
 +
 +{{ :l163:l-163_2019-10-15_eversource_att_petition_crossing_keene_stoddard_sullivan.pdf |2019, October 15: petition exhibits, conductor not replaced, stays at 336.4 25/7, (2) 3#6 copperweld, (1) ADSS}}
  
-{{ ::e_22018-9_115kv_pac_submissions.pdf |2018, October 17PAC submission, replace 64 structures at $14. million (estimated)}}+{{ ::e_22018-9_115kv_pac_submissions.pdf |2018, October 17PAC presentation, replace 64 structures at $14. million (estimated)}}
  
 {{ :f162:1994_f-162_t-198_n-186_l-163_p-145_v-182_de_94-272.pdf |1995, September 6: as identified in Appendix 5 of the petition and on drawings D-7649-387/Exhibit 1 and D-7649-387/Exhibit 2, is over the Ashuelot River in Keene, NH.}} {{ :f162:1994_f-162_t-198_n-186_l-163_p-145_v-182_de_94-272.pdf |1995, September 6: as identified in Appendix 5 of the petition and on drawings D-7649-387/Exhibit 1 and D-7649-387/Exhibit 2, is over the Ashuelot River in Keene, NH.}}
  
  
l-163.1713939727.txt.gz · Last modified: 2024/04/24 02:22 by sigridundset