Both sides previous revisionPrevious revisionNext revision | Previous revision |
l-163 [2024/04/24 02:22] – sigridundset | l-163 [2024/07/23 04:14] (current) – sigridundset |
---|
{{ ::de-20-211.pdf |2021, May 18: crossing permit for North Branch River and an unnamed outflow stream of Island Pond in Stoddard, Otter Brook in Sullivan, the Ashuelot River in Keene, and public land owned by the State of New Hampshire in Stoddard}} | {{ ::de-20-211.pdf |2021, May 18: crossing permit for North Branch River and an unnamed outflow stream of Island Pond in Stoddard, Otter Brook in Sullivan, the Ashuelot River in Keene, and public land owned by the State of New Hampshire in Stoddard}} |
| |
{{ ::a5_eversource_copper_conductor_and_shield_wire_replacement_project.pdf |2021, January 21 PAC presentation, replace 62 structures at $22.3 m.(estimated)}} | {{ :l163:l-163_and_d-108_keene_2021_03_22_pb_minutes_adopted.pdf |2021, March 22: Keene Planning Board |
| minutes}} |
| |
{{ ::l163_0_x104_des_permit_with_waivers.pdf |2020, April 9, DES permit with waivers}} | {{ :c129:373_012121_pac_minutes_final.pdf |2021, January 21: Minutes from PAC meeting.}} |
| |
{{ ::l163_aot_4-6-2020.pdf |2020, April 6: Alteration of Terrain plans}} | {{ ::a5_eversource_copper_conductor_and_shield_wire_replacement_project.pdf |2021, January 21 PAC presentation, replace 62 structures at $22.3 m.(estimated)}} |
| |
{{ ::l163_4-3-2020_cover_page.pdf |2020, April 3, AoT cover page}} | |
| |
{{ ::l163_emails_des_re_protected_species.pdf |2020, April 2: emails re protected species}} | |
| |
{{ ::l163_aot_application.pdf |2020, January 30: Alteration of Terrain application}} | |
| |
{{ ::l163_surface_and_groundwater_overlay_aot_1-12-2020.pdf |2020, January 12: Alteration of Terrain surface and groundwater overlay.}} | |
| |
{{ :l163:l-163_and_d-108_keene_2021_03_22_pb_minutes_adopted.pdf |2021, March 22: Keene Planning Board minutes}} | |
| |
{{ :l163:l-163_2020-12-30_eversource_petition_crossing.pdf |2020, December 30: petition to cross the North Branch River and an unnamed outflow stream of Island Pond in Stoddard, Otter Brook in Sullivan, the Ashuelot River in Keene, and public land owned by the State of New Hampshire in Stoddard.}} | {{ :l163:l-163_2020-12-30_eversource_petition_crossing.pdf |2020, December 30: petition to cross the North Branch River and an unnamed outflow stream of Island Pond in Stoddard, Otter Brook in Sullivan, the Ashuelot River in Keene, and public land owned by the State of New Hampshire in Stoddard.}} |
{{ :l163:l-163_2020-04-16_staff_rec.pdf |2020, April 16: staff recommendation}} | {{ :l163:l-163_2020-04-16_staff_rec.pdf |2020, April 16: staff recommendation}} |
| |
{{ :l163:l-162_2019-10-15_eversource_petition_crossing_keene_stoddard_sullivan.pdf |2019, October 15: petition for crossing, Keene, Stoddard and Sullivan}} | {{ ::l163_0_x104_des_permit_with_waivers.pdf |2020, April 9, DES permit with waivers}} |
| |
{{ :l163:l-163_2019-10-15_eversource_att_petition_crossing_keene_stoddard_sullivan.pdf |2019, October 15: petition exhibits}} | {{ ::l163_aot_4-6-2020.pdf |2020, April 6: Alteration of Terrain plans}} |
| |
{{ ::l-163_2019_linnet_stays_crossing_keene_stoddard_sullivan.pdf |2019; crossing exhibits; conductor not replaced, stays at 336}} | {{ ::l163_4-3-2020_cover_page.pdf |2020, April 3, AoT cover page}} |
| |
| {{ ::l163_emails_des_re_protected_species.pdf |2020, April 2: emails re protected species}} |
| |
{{ :l163:l-163_keene_cc_2020_01_27_pb_agenda_packet.pdf |2020, January 27: Planning Board Agenda}} | {{ ::l163_aot_application.pdf |2020, January 30: Alteration of Terrain application}} |
| |
| {{ :l163:l-163_keene_cc_2020_01_27_pb_agenda_packet.pdf |2020, January 27: Keene Planning Board Agenda}} |
| |
| {{ ::l163_surface_and_groundwater_overlay_aot_1-12-2020.pdf |2020, January 12: Alteration of Terrain surface and groundwater overlay.}} |
| |
{{ ::l163:l-163_10-30-2019_antrim_cc_.pdf |2019, October 30: Antrim Conservation Commission minutes}} | {{ ::l163:l-163_10-30-2019_antrim_cc_.pdf |2019, October 30: Antrim Conservation Commission minutes}} |
| |
| {{ :l163:l-162_2019-10-15_eversource_petition_crossing_keene_stoddard_sullivan.pdf |2019, October 15: petition for crossing, Keene, Stoddard and Sullivan}} |
| |
| {{ :l163:l-163_2019-10-15_eversource_att_petition_crossing_keene_stoddard_sullivan.pdf |2019, October 15: petition exhibits, conductor not replaced, stays at 336.4 25/7, (2) 3#6 copperweld, (1) ADSS}} |
| |
{{ ::e_22018-9_115kv_pac_submissions.pdf |2018, October 17; PAC submission, replace 64 structures at $14. million (estimated)}} | {{ ::e_22018-9_115kv_pac_submissions.pdf |2018, October 17: PAC presentation, replace 64 structures at $14. million (estimated)}} |
| |
{{ :f162:1994_f-162_t-198_n-186_l-163_p-145_v-182_de_94-272.pdf |1995, September 6: as identified in Appendix 5 of the petition and on drawings D-7649-387/Exhibit 1 and D-7649-387/Exhibit 2, is over the Ashuelot River in Keene, NH.}} | {{ :f162:1994_f-162_t-198_n-186_l-163_p-145_v-182_de_94-272.pdf |1995, September 6: as identified in Appendix 5 of the petition and on drawings D-7649-387/Exhibit 1 and D-7649-387/Exhibit 2, is over the Ashuelot River in Keene, NH.}} |
| |
| |