L-163 115kV line
2021, May 18: crossing permit for North Branch River and an unnamed outflow stream of Island Pond in Stoddard, Otter Brook in Sullivan, the Ashuelot River in Keene, and public land owned by the State of New Hampshire in Stoddard
2021, March 22: Keene Planning Board
minutes
2021, January 21: Minutes from PAC meeting.
2021, January 21 PAC presentation, replace 62 structures at $22.3 m.(estimated)
2020, December 30: petition to cross the North Branch River and an unnamed outflow stream of Island Pond in Stoddard, Otter Brook in Sullivan, the Ashuelot River in Keene, and public land owned by the State of New Hampshire in Stoddard.
2020, May 21: Order summary
2020, May 21: Order
2020, April 28: second supplement to initial petition
2020, April 28: supplement to initial petition, exhibits
2020, April 16: staff recommendation
2020, April 9, DES permit with waivers
2020, April 6: Alteration of Terrain plans
2020, April 3, AoT cover page
2020, April 2: emails re protected species
2020, January 30: Alteration of Terrain application
2020, January 27: Keene Planning Board Agenda
2020, January 12: Alteration of Terrain surface and groundwater overlay.
2019, October 30: Antrim Conservation Commission minutes
2019, October 15: petition for crossing, Keene, Stoddard and Sullivan
2019, October 15: petition exhibits, conductor not replaced, stays at 336.4 25/7, (2) 3#6 copperweld, (1) ADSS
2018, October 17: PAC presentation, replace 64 structures at $14. million (estimated)
1995, September 6: as identified in Appendix 5 of the petition and on drawings D-7649-387/Exhibit 1 and D-7649-387/Exhibit 2, is over the Ashuelot River in Keene, NH.