l-163

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
l-163 [2024/04/24 02:27] sigridundsetl-163 [2024/07/23 04:14] (current) sigridundset
Line 5: Line 5:
 {{ ::de-20-211.pdf |2021, May 18: crossing permit for North Branch River and an unnamed outflow stream of Island Pond in Stoddard, Otter Brook in Sullivan, the Ashuelot River in Keene, and public land owned by the State of New Hampshire in Stoddard}} {{ ::de-20-211.pdf |2021, May 18: crossing permit for North Branch River and an unnamed outflow stream of Island Pond in Stoddard, Otter Brook in Sullivan, the Ashuelot River in Keene, and public land owned by the State of New Hampshire in Stoddard}}
  
-{{ :l163:l-163_and_d-108_keene_2021_03_22_pb_minutes_adopted.pdf |2021, March 22: Keene Planning Board minutes}}+{{ :l163:l-163_and_d-108_keene_2021_03_22_pb_minutes_adopted.pdf |2021, March 22: Keene Planning Board  
 +minutes}} 
 + 
 +{{ :c129:373_012121_pac_minutes_final.pdf |2021, January 21: Minutes from PAC meeting.}}
  
 {{ ::a5_eversource_copper_conductor_and_shield_wire_replacement_project.pdf |2021, January 21 PAC presentation, replace 62 structures at $22.3 m.(estimated)}} {{ ::a5_eversource_copper_conductor_and_shield_wire_replacement_project.pdf |2021, January 21 PAC presentation, replace 62 structures at $22.3 m.(estimated)}}
Line 39: Line 42:
 {{ :l163:l-162_2019-10-15_eversource_petition_crossing_keene_stoddard_sullivan.pdf |2019, October 15: petition for crossing, Keene, Stoddard and Sullivan}} {{ :l163:l-162_2019-10-15_eversource_petition_crossing_keene_stoddard_sullivan.pdf |2019, October 15: petition for crossing, Keene, Stoddard and Sullivan}}
  
-{{ :l163:l-163_2019-10-15_eversource_att_petition_crossing_keene_stoddard_sullivan.pdf |2019, October 15: petition exhibits, conductor not replaced, stays at 336}}+{{ :l163:l-163_2019-10-15_eversource_att_petition_crossing_keene_stoddard_sullivan.pdf |2019, October 15: petition exhibits, conductor not replaced, stays at 336.4 25/7, (2) 3#6 copperweld, (1) ADSS}}
  
 {{ ::e_22018-9_115kv_pac_submissions.pdf |2018, October 17: PAC presentation, replace 64 structures at $14. million (estimated)}} {{ ::e_22018-9_115kv_pac_submissions.pdf |2018, October 17: PAC presentation, replace 64 structures at $14. million (estimated)}}
l-163.1713940056.txt.gz · Last modified: 2024/04/24 02:27 by sigridundset