o-154 [2024/04/04 05:33] – sigridundset | o-154 [2024/11/22 08:07] (current) – sigridundset |
---|
O-154 115kV line | O-154 115kV line |
| |
| {{ ::eversource_2024_lsp_a.pdf |2024, November 20: Local System Plan, in-service, $35 m.}} |
| |
{{ ::2023_11_15_topac_lsp_eversource_presentation.pdf |2023, November 15: Eversource TOPAC (Transmission Owners Planning Advisory Committee presentation to PAC}} | {{ ::2023_11_15_topac_lsp_eversource_presentation.pdf |2023, November 15: Eversource TOPAC (Transmission Owners Planning Advisory Committee presentation to PAC}} |
| |
| {{ ::o154:0154.pdf |2023, September 20: DES acknowledges Eversource withdrawal of wetlands application}} |
| |
{{ ::local-system-plan.pdf |2022, October 19: 2019 local system plan E$-presentation to PAC}} | {{ ::local-system-plan.pdf |2022, October 19: 2019 local system plan E$-presentation to PAC}} |