Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision |
p-145 [2023/11/11 02:53] – sigridundset | p-145 [2025/01/19 00:35] (current) – sigridundset |
---|
| |
{{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}} | {{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}} |
| |
| {{ :p145:e_more_photos.pdf |2024, December: photos provided for SEC or PUC}} |
| |
| {{ :p145:p-145_tca_allowed.pdf |2023, July 7: $51 m. Transmission Cost Allocation approved}} |
| |
| {{ ::a00_051623_rc_agenda_p145_p106_q171.pdf |2023, May 16: NEPOOL Reliability meeting agenda}} |
| |
{{ :p145:p145_rare_plants_email.pdf |2022, October 18: Rare plants email}} | {{ :p145:p145_rare_plants_email.pdf |2022, October 18: Rare plants email}} |
| |
{{ ::k165_p145_.pdf |2016, January 7: TCA approval, apparently reliability}} | {{ ::k165_p145_.pdf |2016, January 7: TCA approval, apparently reliability}} |
| |
| {{ :p145:p-145_proposed_reliability_uprate_10-2012.png?linkonly |2012, October, proposed reliability uprate}} |
| |
| {{ :p145:p-145_2008.png?linkonly |2008:former P-145 line}} |
| |
| {{ :f162:1994_f-162_t-198_n-186_l-163_p-145_v-182_de_94-272.pdf |1995, September 6: as identified in Appendix 9 of the petition and on drawings D-7649-393/Exhibit 1 and D-7649-393/Exhibit 2, is over Turtle Pond in Concord, NH.}} |
| |
| |