Both sides previous revisionPrevious revisionNext revision | Previous revision |
q-171 [2023/10/18 05:00] – sigridundset | q-171 [2024/04/06 09:10] (current) – sigridundset |
---|
Q-171 115kV line | ====== Q-171 115kV line ====== |
| |
| |
| {{ ::a00_051623_rc_agenda_p145_p106_q171.pdf |2023, May 16: NEPOOL Reliability meeting agenda}} |
| |
{{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}} | {{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}} |
| |
| {{ ::c196_-_a252_-_q171_des_to_gza_.pdf |2023, January 5: DES and GZA email}} |
| |
{{ ::c196_-_q171_-_a253_des_permit_with_waivers.pdf |2023, January 9 DES permit with waivers from requirements of Env-Wq 1503.12(d)(1), Env-Wq 1503.21(d)(6) and (7), and Env-Wq 1504.09}} | {{ ::c196_-_q171_-_a253_des_permit_with_waivers.pdf |2023, January 9 DES permit with waivers from requirements of Env-Wq 1503.12(d)(1), Env-Wq 1503.21(d)(6) and (7), and Env-Wq 1504.09}} |
| |
{{ ::c196_-_a252_-_q171_des_to_gza_.pdf |2023, January 5: DES and GZA email}} | {{ ::c196_-_a252_-_q171_des_to_gza_.pdf |2023, January 5: DES and GZA email}} |
| |
| {{ :c196:c196_q171_a253_fish_and_game_email.pdf |2022, December 28: emails, Fish & Game, DES, E$}} |
| |
{{ ::c196_-_q171_-_a253_f_g_conditions.pdf |2022, December 19 : Fish & Game Wildlife recommendations}} | {{ ::c196_-_q171_-_a253_f_g_conditions.pdf |2022, December 19 : Fish & Game Wildlife recommendations}} |
| |
{{ ::c196_-_q171_des_permit_with_waivers.pdf |2022, September 2: DES permit with waivers from Env-Wq 1503.12(d)(1&2), Env-Wq 1503.21(d)(6&7), and Env-Wq 1504.09}} | {{ ::c196_-_q171_des_permit_with_waivers.pdf |2022, September 2: DES permit with waivers from Env-Wq 1503.12(d)(1&2), Env-Wq 1503.21(d)(6&7), and Env-Wq 1504.09}} |
| |
| {{ ::aot_2215_start_of_construction.pdf |2022, September 2: Start of Construction Notification}} |
| |
{{ ::c196:4-cre-2022-018-license.pdf |2022, August 15: permit}} | {{ ::c196:4-cre-2022-018-license.pdf |2022, August 15: permit}} |
{{ ::c196:3-cre-2022-018-energy-staff-recommendation.pdf |2022, July 27: staff recommendation}} | {{ ::c196:3-cre-2022-018-energy-staff-recommendation.pdf |2022, July 27: staff recommendation}} |
| |
{{ ::c196:1-cre-2022-018-petition.pdf |2022:July 22: E$ petition for river crossing}} | {{ ::c196:1-cre-2022-018-petition.pdf |2022:July: E$ petition for river crossing}} |
| |
{{ ::c196:2-cre-2022-018-petition-attachments.pdf |2022, petition attachments}} | {{ ::c196:2-cre-2022-018-petition-attachments.pdf |2022, petition attachments}} |
| |
{{ ::c196:a3_eversource_new_hampshire_asset_conditions_wood_structure_replacement.pdf |2022, June 15:presentation to PAC}} | {{ ::c196:a3_eversource_new_hampshire_asset_conditions_wood_structure_replacement.pdf |2022, June 15:presentation to PAC}} |
| |
{{ ::c189_-_m108_-_h137_-_g146_des_permit_with_waivers.pdf |}} | |
| |
{{ ::c189_g146_m137_m108_5-22-2023.pdf |}} | |
| |
{{ ::c196_-_a252_-_q171_des_to_gza_.pdf |2023, January 5: DES and GZA email}} | |
| |
{{ ::1-cre-2022-020-petition.pdf |2022: petition}} | {{ ::1-cre-2022-020-petition.pdf |2022: petition}} |
{{ ::cre-2022-020-order-of-notice.pdf |2022: order of notice}} | {{ ::cre-2022-020-order-of-notice.pdf |2022: order of notice}} |
| |
{{ ::document.pdf |2021, December 9:: Town of Bow public hearing on wetlands damage and after-the-fact truck access}} | {{ ::document.pdf |2021, December 9: Town of Bow, Conditional Use Permit and public hearing on wetlands damage and after-the-fact truck access}} |
| |
{{ ::q171_town_of_bow.pdf |2020:Town of Bow}} | {{ ::q171_town_of_bow.pdf |2020:Town of Bow}} |
| |
| {{ :c196:c-196_6-6-1975_glen_lake_crossing.pdf |1996, June 6: petition for crossing Glen Lake; "reconstruct two parallel 115 KV electric transmission lines of wires and cables over and across Glen Lake in the Town of Goffstown, New Hampshire, which are part of its 115KV system connecting the Greggs Substation in Goffstown and the Merrimack Substation in Bow;"}} |
| |
| |