Q-171 115kV line
2023, May 16: NEPOOL Reliability meeting agenda
map showing line location
2023, January 5: DES and GZA email
2023, January 9 DES permit with waivers from requirements of Env-Wq 1503.12(d)(1), Env-Wq 1503.21(d)(6) and (7), and Env-Wq 1504.09
2023, January 19, presentation to PAC, 29 out of 145 structures replaced, $6.2 m.
2023, January 9 DES permit with waivers from requirements of Env-Wq 1503.12(d)(1), Env-Wq 1503.21(d)(6) and (7), and Env-Wq 1504.09
2023, January 5: DES and GZA email
2022, December 28: emails, Fish & Game, DES, E$
2022, December 19 : Fish & Game Wildlife recommendations
2022, September 2: DES permit with waivers from Env-Wq 1503.12(d)(1&2), Env-Wq 1503.21(d)(6&7), and Env-Wq 1504.09
2022, September 2: Start of Construction Notification
2022, August 15: permit
2022, July 27: staff recommendation
2022:July: E$ petition for river crossing
2022, petition attachments
2022, July 7: AOT transmittal cover page
2022, June 28: Surface and Groundwater resources
2022, June 15:presentation to PAC
2022: petition
2022: petition attachments
2022: staff recommendation
2022: petition attachments revised
2022: staff recommendations revised
2022: license
2022: order of notice
2021, December 9: Town of Bow, Conditional Use Permit and public hearing on wetlands damage and after-the-fact truck access
2020:Town of Bow
1996, June 6: petition for crossing Glen Lake; "reconstruct two parallel 115 KV electric transmission lines of wires and cables over and across Glen Lake in the Town of Goffstown, New Hampshire, which are part of its 115KV system connecting the Greggs Substation in Goffstown and the Merrimack Substation in Bow;"