Both sides previous revisionPrevious revisionNext revision | Previous revision |
s-136 [2024/03/30 11:40] – sigridundset | s-136 [2025/07/05 03:05] (current) – sigridundset |
---|
====== S-136 115kV line ====== | ====== S-136 115kV line ====== |
| |
| "Originally constructed to serve customers in New Hampshire in 1969" |
| |
{{ :s136:s-136_-2023-027-application.pdf |2023, December 19: petition to cross}} | {{ ::eversource_2024_lsp_a.pdf |2024, November 20: Local System Plan, under-construction}} |
| |
{{ :s136:s-136_-2023-027-exhibits.pdf |2023, exhibits for crossing}} | {{ :s136:eversource_fs_application_for_s-136_line_rebuild.pdf |2024, October 14: kp comment on Eversource application to Forest Service}} |
| |
| {{ :s136:project_information_form_-_eversource_s136_transmission_line_rebuild.pdf |2024, October 4: Eversource small projects day application for replacement of 214 structures and permanent road and crane pad construction in White Mountain National Forest}} |
| |
| {{ :s136:cre-2023-027-license.pdf |2024, February 16: License for crossings}} |
| |
| {{ :s136:cre-2023-027-staff-recommendation.pdf |2024, January 30: Staff recommendation}} |
| |
| {{ :s136:s-136_eversource_exceeding_clearances.png?linkonly |2024, February 4: Eversource exceeds required conductor clearances by 15.5', 9.6', 31.9', 19.5', 37.5', 43.9', 22.9'.}} |
| |
| {{ :s136:cre-2023-027-exhibits.pdf |2024, February 4: Exhibits for crossing application dated December 15, 2023 and December 2016.}} |
| |
| {{ :s136:s-136_-2023-027-application.pdf |2023, December 19: petition to cross}} |
| |
{{ ::2023_11_15_topac_lsp_eversource_presentation.pdf |2023, November 15: Eversource TOPAC (Transmission Owners Planning Advisory Committee presentation to PAC, "Rebuild the aging 115kV line with larger conductor and OPGW "}} | {{ ::2023_11_15_topac_lsp_eversource_presentation.pdf |2023, November 15: Eversource TOPAC (Transmission Owners Planning Advisory Committee presentation to PAC, "Rebuild the aging 115kV line with larger conductor and OPGW "}} |
{{ :s136:s-136_2020-08-07_staff_rev_recommendation.pdf |2020, August 7, staff revised map}} | {{ :s136:s-136_2020-08-07_staff_rev_recommendation.pdf |2020, August 7, staff revised map}} |
| |
{{ :s136:s-136_staff_recommendation.pdf |2020, July 31: staff recommendationThis is a project to | {{ :s136:s-136_staff_recommendation.pdf |2020, July 31: staff recommendation This is a project to |
modify or rebuild (14) fourteen structures on its existing S136 Line. No conductors or neutral wire will be replaced in the project. All electric wires shall be transferred from existing structures to new structures replaced at the same locations. The existing static wire will be replaced with (1) .457 OPGW cable. , "This is a project to modify or rebuild (14) fourteen structures on its existing S136 Line. No conductors or neutral wire will be replaced in the project. All electric wires shall be transferred from existing structures to new structures replaced at the same locations. The existing static wire will be replaced with (1) .457 OPGW cable. "}} | modify or rebuild (14) fourteen structures on its existing S136 Line. No conductors or neutral wire will be replaced in the project. All electric wires shall be transferred from existing structures to new structures replaced at the same locations. The existing static wire will be replaced with (1) .457 OPGW cable. , "This is a project to modify or rebuild (14) fourteen structures on its existing S136 Line. No conductors or neutral wire will be replaced in the project. All electric wires shall be transferred from existing structures to new structures replaced at the same locations. The existing static wire will be replaced with (1) .457 OPGW cable. "}} |
| |
| |
{{ ::decision_memo_eversource_s136_line_structure_and_optical_ground_wire_replacement_project.pdf |2020, July 2: USFS decision permitting project}} | {{ ::decision_memo_eversource_s136_line_structure_and_optical_ground_wire_replacement_project.pdf |2020, July 2: USFS decision permitting project}} |
{{ ::s136_des_permit_with_waivers_4-9-2020.pdf |2020, April 9: DES permit waiving | {{ ::s136_des_permit_with_waivers_4-9-2020.pdf |2020, April 9: DES permit waiving |
specific requirements of: Env-Wq 1504.09, }} | specific requirements of: Env-Wq 1504.09, }} |
| |
| {{ :s136:s-136_1_aot_area.png?linkonly |2020, April 9: 20.1 acres impacts}} |
| |
{{ :s136:19-162_2020-04-01_eversource_supp_petition_crossing.pdf |2020, April 1: crossing petition supplement, " Eversource intends to complete four structure replacements...(Str. 293, 294 and 298, 299)... in addition to replacing the existing static wire with OPGW"}} | {{ :s136:19-162_2020-04-01_eversource_supp_petition_crossing.pdf |2020, April 1: crossing petition supplement, " Eversource intends to complete four structure replacements...(Str. 293, 294 and 298, 299)... in addition to replacing the existing static wire with OPGW"}} |
| |
{{ :s136:19-162_2020-04-01_eversource_att_supp_petition_crossing.pdf |2020. April 1: crossing petition supplement exhibits, dated 6/19-11/19}} | {{ :s136:19-162_2020-04-01_eversource_att_supp_petition_crossing.pdf |2020. April 1: crossing petition supplement exhibits;Androscoggin River, Moose Brook and state owned lands}} |
| |
{{ ::s136_aot_application.pdf |2020, March 20: AoT application, Stantec}} | {{ ::s136_aot_application.pdf |2020, March 20: AoT application, Stantec}} |
| |
{{ ::a7_eversource_lsp.pdf |2019, October 24: PAC presentation local system plan, under-construction, $6.2 m. replace existing structures}} | {{ ::a7_eversource_lsp.pdf |2019, October 24: PAC presentation local system plan, under-construction, $6.2 m. replace existing structures}} |
| |
| {{ :s136:s-136_supp_petition_6-15-20_2020-06-15_eversource_supp_petition.pdf |2020, June 15: supplemental petition to cross Androscoggin River}} |
| |
| {{ :s136:s-136_2019_exhibits_2_2019-10-03_eversource_att_petition_crossing_androscoggin_gorham_randolph.pdf |2019, October 3: exhibits for crossing; (2) .457 OPGW, 795 ASCR conductor}} |
| |
{{ :s136:s-136_2019-10-03_eversource_petition_crossing_androscoggin_gorham_randolph.pdf |2019, September 3: Petition to cross Androscoggin, Gorham and Randolph, no mention of OPGW}} | {{ :s136:s-136_2019-10-03_eversource_petition_crossing_androscoggin_gorham_randolph.pdf |2019, September 3: Petition to cross Androscoggin, Gorham and Randolph, no mention of OPGW}} |